Safety information search results
Filter your results
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK [sub-heading only] (15)
- (-) CROSS Newsletter (17)
- CROSS Safety Report (17)
- News [sub-heading only] (3)
CROSS regions
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
GRP panels as permanent shuttering
A reporter highlights problems that were encountered when Glassfibre Reinforced Plastic (GRP) panels were used as permanent formwork on a highway construction project.
1 October 2012
CROSS Safety Report
Report ID: 342
Region: CROSS-UK
Inadequate steel beam splice
A reporter raises concerns of an inadequate steel beam splice they came across on site.
1 October 2013
CROSS Safety Report
Report ID: 343
Region: CROSS-UK
Retaining wall excavation collapse
A 6m deep excavation formed for constructing a retaining wall on a domestic project collapsed due to insufficient propping.
1 July 2019
CROSS Safety Report
Report ID: 800
Region: CROSS-UK
Bridge bearing design and installation - further concerns raised
A reporter says that the issue of successful co-ordination between designers, contractors and specialist bearing suppliers is one they have experienced.
1 January 2019
CROSS Safety Report
Report ID: 796
Region: CROSS-UK
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK
Dangerous alterations to steel beam supports
A local authority building control officer went to site and witnessed on an upper floor that the columns had been removed out of sequence, before the new frame had been constructed.
1 October 2015
CROSS Safety Report
Report ID: 479
Region: CROSS-UK
Policing of CE marking on steelwork
A reporter has a question regarding structural steel safety, particularly on steel gantry systems supporting lifting equipment.
1 July 2015
CROSS Safety Report
Report ID: 510
Region: CROSS-UK
Fabrication issues with imported steelwork truss in Australia
A reporter raises concerns after a steel truss had significant defects and deflected after erection requiring rectification.
1 July 2014
CROSS Safety Report
Report ID: 390
Region: CROSS-UK
Contractor varies structural design intention
A reporter was made aware by the building owner of an unauthorised structural alteration that had been made on site.
1 January 2015
CROSS Safety Report
Report ID: 420
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.