Safety information search results
Filter your results
Building or structure type
- Bridges (11)
- Buildings
(48)
- Car parks (2)
- Commercial (5)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (2)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (1)
- Public, religious & civic buildings (2)
- Recreational buildings (3)
- Residential (13)
- Stadiums (1)
- Tall buildings (4)
- Theatres & other entertainment buildings (3)
- Transport buildings (1)
- Masts & towers (1)
- Retaining structures (2)
- Roads (1)
- Sewers (1)
- Temporary structures (2)
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Project type
Method of construction
Structural form
Elements & systems
- Balustrades (3)
- Basements (2)
- Beams (13)
- Bracing (3)
- Ceilings (3)
- Cladding (10)
- Columns (4)
- Fasteners & connections (26)
- Fire protection (4)
- Foundations (3)
- Insulation (2)
- Light gauge steel framing (2)
- Parapets (1)
- Roofs (7)
- Sandwich panels (1)
- Signs (1)
- Slabs (5)
- Trusses (4)
- Walls (7)
- Wall ties (2)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (41)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (3)
- CROSS Newsletter (27)
- (-) CROSS Safety Report (72)
- News [sub-heading only] (10)
CROSS regions
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
1 October 2011
CROSS Safety Report
Report ID: 241
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Example of small temporary stage structure
This is an example of a small stage that is potentially unstable.
1 January 2013
CROSS Safety Report
Report ID: 302
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Incorrectly installed tension control bolts could have led to serious consequences
A reporter finds incorrectly installed system HRC preload bolt assemblies, better known as tension control bolts, during a site inspection of a new highway bridge over a railway. The incorrectly fitted bolts could have had major structural implications, and led to other safety risks, if the installation error had not been spotted.
24 May 2023
CROSS Safety Report
Report ID: 1196
Region: CROSS-UK
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
Glued on stainless steel panels fall
A ceiling in a retail setting was designed to be faced with reflective finish panels. The contractor proposed stainless steel bonded to MDF with folded edges and concealed mechanical restraint. The designer overruled the contractor and selected an adhesive-only solution which was implemented. Some months later, several panels failed, with some stainless steel facings falling to the floor.
20 February 2023
CROSS Safety Report
Report ID: 1187
Region: CROSS-UK
Failure to grout steel frame bases
A reporter describes a problem that arose during the construction stage of a project when a steel frame supporting pipe and cable racks was loaded before the frame baseplates were grouted.
24 May 2023
CROSS Safety Report
Report ID: 1190
Region: CROSS-UK
Wrong length blind bolts lead to unsafe bridge structure
Bridge strengthening being carried out using blind bolts left a structure in an unsafe condition with traffic loading on it.
20 February 2023
CROSS Safety Report
Report ID: 1185
Region: CROSS-UK
Concern about rebending starter bars
This report concerns the bending and rebending of starter bars on site during the construction of a multi storey tower. The reporter considered that such a practice could compromise the structure under extreme load conditions.
24 May 2023
CROSS Safety Report
Report ID: 1164
Region: CROSS-UK