Safety information search results
Filter your results
Building or structure type
Building height
Materials
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Contractor varies structural design intention
A reporter was made aware by the building owner of an unauthorised structural alteration that had been made on site.
1 January 2015
CROSS Safety Report
Report ID: 420
Region: CROSS-UK
High mast light poles removed from UK site
Five high mast light poles (HMLPs) were removed from a public site as it was considered that there was a possibility of collapse.
1 January 2017
CROSS Safety Report
Report ID: 610
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.