Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK [sub-heading only] (7)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (6)
- CROSS Safety Report (12)
- News [sub-heading only] (2)
CROSS regions
Critical welding of structural steelwork missed
The designer of a steelwork roof frame found a critical fabrication error when inspecting steelwork on site before it was erected.
21 November 2022
CROSS Safety Report
Report ID: 1126
Region: CROSS-UK
Liquid metal assisted cracking (LMAC)
A reporter raises concerns about the risk of liquid metal assisted cracking during the hot dip galvanising process.
1 November 2006
CROSS Safety Report
Report ID: 45
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Example of small temporary stage structure
This is an example of a small stage that is potentially unstable.
1 January 2013
CROSS Safety Report
Report ID: 302
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Light steel truss issues
A reporter believes that greater awareness is needed of deficiencies in the light steel truss industry (trusses made from cold-formed steel sections).
1 February 2020
CROSS Safety Report
Report ID: 817
Region: CROSS-AUS
Bridge bearing design and installation - further concerns raised
A reporter says that the issue of successful co-ordination between designers, contractors and specialist bearing suppliers is one they have experienced.
1 January 2019
CROSS Safety Report
Report ID: 796
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Grades of weldable quality bolts
A reporter says grade 8.8 bolts are not required to be manufactured as being weldable according to the relevant product standards e.g. ISO 898-1 and -2.
1 April 2014
CROSS Safety Report
Report ID: 392
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.