Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Failure of cantilevered stone staircase
During the renovation and change-of-use conversion of a former minor stately home built around 1830, under pedestrian loading, a ‘cantilevered’ stone staircase partially collapsed without warning.
21 February 2023
CROSS Safety Report
Report ID: 1147
Region: CROSS-UK
Thatched roof fire during renovation
A reporter is worried about construction practices after a Grade 1 listed church was lost to fire following renovation works on the lead roof.
24 May 2023
CROSS Safety Report
Report ID: 1174
Region: CROSS-UK
Collapse of unusual hybrid concrete and steel strand truss on school roof
This report concerns the collapse of a school hall roof which resulted from the failure of one of a number of unusual hybrid concrete and steel strand trusses. The trusses consist of a precast reinforced concrete top chord and verticals with a bottom chord of tensioned steel strands. The failure of the truss resulted in the collapse of the supported flat roof local to the failed truss, and da...
25 May 2023
CROSS Safety Report
Report ID: 1227
Region: CROSS-UK
Do planning applications hinder safety improvements?
A potential issue about the reconstruction of a structurally inadequate external fire escape from a building has been raised with CROSS.
17 November 2022
CROSS Safety Report
Report ID: 1043
Region: CROSS-UK
Inadequate temporary works on domestic project
An example of inadequate temporary works on a project, and problems reporting the safety issue to the authorities.
14 December 2021
CROSS Safety Report
Report ID: 1044
Region: CROSS-UK
Structural failure of older timber connections
A reporter shares three examples of the structural failure or inadequacies of connections in existing timber structures that they have encountered.
13 December 2021
CROSS Safety Report
Report ID: 1040
Region: CROSS-UK
Failure of beams in listed building
Conversion and refurbishment work on a listed building led to structural failures of beams and subsequent difficulties in resolving safety matters between the various agencies involved.
30 July 2021
CROSS Safety Report
Report ID: 1016
Region: CROSS-UK
Concern over the quality of a fire safety design submission
A Building Control Officer is disquieted by the quality of a design submission and the respective approach of a fire engineer in assessing structural fire matters.
17 November 2022
CROSS Safety Report
Report ID: 1029
Region: CROSS-UK
Progressive collapse of mill building
Nearby families were evacuated after part of a four-storey former mill building collapsed adjacent to their homes.
1 October 2008
CROSS Safety Report
Report ID: 121
Region: CROSS-UK