Safety information search results
Filter your results
Products
Project or lifecycle stage
Codes, standards & regulations
Fire incident response
Project type
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Concern over the quality of a fire safety design submission
A Building Control Officer is disquieted by the quality of a design submission and the respective approach of a fire engineer in assessing structural fire matters.
17 November 2022
CROSS Safety Report
Report ID: 1029
Region: CROSS-UK
Progressive collapse of mill building
Nearby families were evacuated after part of a four-storey former mill building collapsed adjacent to their homes.
1 October 2008
CROSS Safety Report
Report ID: 121
Region: CROSS-UK
Progressive collapse of an old mill building during a fire
An old mill building that was constructed around 1830 collapsed unexpectedly in a fire.
1 October 2008
CROSS Safety Report
Report ID: 122
Region: CROSS-UK
Do current regulations apply when repairing older buildings?
A 19th century three story mill was subject to a fire which resulted in the sudden collapse of part of the interior structure.
1 October 2010
CROSS Safety Report
Report ID: 212
Region: CROSS-UK
Alteration to historic column bases causes settlement issues
Historic timber columns settled and tilted after unauthorised changes were made to their foundation bases.
1 October 2014
CROSS Safety Report
Report ID: 458
Region: CROSS-UK
Fibrous plaster ceiling features
This recent report of a serious concern about an old fibrous plaster ceiling has similarities to the Apollo Theatre ceiling collapse in London in December 2013.
1 July 2015
CROSS Safety Report
Report ID: 518
Region: CROSS-UK
Defects in wrought iron girder from 1879
Defects were found in the strut members of a three span wrought iron girder from 1879 while major strengthening and refurbishment works were being carried out.
1 April 2016
CROSS Safety Report
Report ID: 570
Region: CROSS-UK
Falling lath and plaster ceiling
A 100 year old lath and plaster ceiling in a shop unit collapsed in part, injuring the shop keeper.
1 April 2016
CROSS Safety Report
Report ID: 562
Region: CROSS-UK
Defects found in previously repaired bridge
While carrying out strengthening work on a bridge, there was concern that by removing the non-structural encasement, alternative load paths had been removed.
1 April 2016
CROSS Safety Report
Report ID: 564
Region: CROSS-UK
Lack of fire safety competence in care home setting
A fire and rescue service is concerned about the lack of competence of maintenance personnel working in care homes. This is following two incidents where poor electrical and fire door maintenance put residents at risk.
20 February 2024
CROSS Safety Report
Report ID: 1255
Region: CROSS-UK