Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (15)
- (-) CROSS Newsletter (17)
- CROSS Safety Report (17)
- News [sub-heading only] (3)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Certification of steel sheet piling
A Government Agency raises concerns about the authenticity of documents provided for steel sheet piles produced by an overseas manufacturer.
1 January 2013
CROSS Safety Report
Report ID: 331
Region: CROSS-UK
Composition of new precast concrete blocks
A UK firm has raised concerns over a new large precast concrete block range which seems to use a wide range of secondary recycled aggregates in its mix, including some potentially hazardous waste.
1 July 2014
CROSS Safety Report
Report ID: 380
Region: CROSS-UK
Stability of brick walls
A 230mm cantilevered brick wall approximately 1.6m high failed after backfill material was placed behind it, which was not the design intent.
1 April 2015
CROSS Safety Report
Report ID: 475
Region: CROSS-UK
Cantilevered brickwork - fatal collapse during construction
A blade of 270mm cavity brickwork in a temporary condition fell and killed a bricklayer after sixteen scaffold planks were leant against the wall on the side remote from the bricklayer.
1 April 2015
CROSS Safety Report
Report ID: 476
Region: CROSS-UK
Unbraced temporary props
An alarming photograph has been sent by a contributor.
1 January 2015
CROSS Safety Report
Report ID: 482
Region: CROSS-UK
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
Failure of epoxy resin bonded anchors in concrete
A reporter expresses concern about adhesive bonded anchors after anchors failed progressively on site during a lifting operation.
1 April 2014
CROSS Safety Report
Report ID: 429
Region: CROSS-UK
High strength concrete incident
Confusion on sites lead to the incorrect concrete grade being used for some structural elements.
1 April 2014
CROSS Safety Report
Report ID: 406
Region: CROSS-UK
Blockwork lateral restraint
A recent building control inspection revealed issues with basement blockwork walls restrained by wind posts.
1 January 2015
CROSS Safety Report
Report ID: 414
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.