Safety information search results
Filter your results
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK [sub-heading only] (15)
- (-) CROSS Newsletter (17)
- CROSS Safety Report (17)
- News [sub-heading only] (3)
CROSS regions
Effect of staff change on a design
A reporter illustrates how risk can be generated from staff turnover.
1 October 2012
CROSS Safety Report
Report ID: 277
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Safety concerns with twin wall system
A reporter raises safety concerns over the temporary stability of twin wall systems after they observed failures during construction.
1 April 2014
CROSS Safety Report
Report ID: 402
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Risks from off-site manufacture and hybrid construction
A reporter was recently investigating a ‘near miss’ involving concrete construction in which pre-cast and in-situ concrete were used in combination.
1 January 2016
CROSS Safety Report
Report ID: 529
Region: CROSS-UK
Post-fixed RC anchors - assumptions lead to unsafe design
A reporter raises concerns that engineers may be using post-fixed anchors without complying with the manufacturer's guidance or ensuring that their design assumptions are applicable.
1 January 2015
CROSS Safety Report
Report ID: 443
Region: CROSS-UK
Columns missing due to 3D modelling
A new eight storey residential concrete frame building was being constructed and several columns were omitted from the ground and first floor level drawings, says a reporter.
1 January 2017
CROSS Safety Report
Report ID: 614
Region: CROSS-UK
Inadequate bolted connections supporting stairs
Concerns are raised over the safe design and installation of rolled steel angles (RSA) used to support heavy precast stair and landing units.
1 April 2017
CROSS Safety Report
Report ID: 615
Region: CROSS-UK
Tower crane foundation design error
Whilst carrying out an independent design check on a tower crane foundation design, a reporter discovered that the piles used on site did not have the required tension capacity.
1 July 2018
CROSS Safety Report
Report ID: 662
Region: CROSS-UK
Inadequate billets used in precast concrete connections
Whilst completing a third-party design appraisal, a correspondent found that solid steel billets intended to form the primary shear transfer mechanism between concrete beams and columns were insufficient for this purpose.
1 April 2019
CROSS Safety Report
Report ID: 705
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.