Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK [sub-heading only] (19)
- (-) CROSS Newsletter (24)
- CROSS Safety Report (24)
- News [sub-heading only] (3)
CROSS regions
Columns missing due to 3D modelling
A new eight storey residential concrete frame building was being constructed and several columns were omitted from the ground and first floor level drawings, says a reporter.
1 January 2017
CROSS Safety Report
Report ID: 614
Region: CROSS-UK
Inadequate bolted connections supporting stairs
Concerns are raised over the safe design and installation of rolled steel angles (RSA) used to support heavy precast stair and landing units.
1 April 2017
CROSS Safety Report
Report ID: 615
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Tower crane foundation design error
Whilst carrying out an independent design check on a tower crane foundation design, a reporter discovered that the piles used on site did not have the required tension capacity.
1 July 2018
CROSS Safety Report
Report ID: 662
Region: CROSS-UK
Inadequate billets used in precast concrete connections
Whilst completing a third-party design appraisal, a correspondent found that solid steel billets intended to form the primary shear transfer mechanism between concrete beams and columns were insufficient for this purpose.
1 April 2019
CROSS Safety Report
Report ID: 705
Region: CROSS-UK
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK
Concrete grade confusion in software
A reporter noticed that the design calculation report generated by a proprietary software package called for ‘concrete characteristic strength = 45N/mm2’, but did not confirm whether this refers to the cylinder or cube strength.
1 April 2019
CROSS Safety Report
Report ID: 788
Region: CROSS-UK
Retaining wall excavation collapse
A 6m deep excavation formed for constructing a retaining wall on a domestic project collapsed due to insufficient propping.
1 July 2019
CROSS Safety Report
Report ID: 800
Region: CROSS-UK
Casting, transporting and installing precast concrete kerbs
A reporter shares their experience of how collaborative engineering thinking involving several parties enabled a design solution to be found that could be constructed safely.
1 October 2018
CROSS Safety Report
Report ID: 778
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK