Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (4)
- Assessment project [sub-heading only] (2)
- Construction project [sub-heading only] (37)
- Demolition project (2)
- Excavation (1)
- Extension project (3)
- New build (30)
- Refurbishment (1)
- Remediation project (3)
- Repair project (3)
- Strengthening project (3)
- Structural assessment (3)
Construction period
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (3)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (4)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK [sub-heading only] (49)
- (-) CROSS Newsletter (57)
- CROSS Safety Report (57)
- News [sub-heading only] (4)
CROSS regions
Incomplete casting of composite brick/concrete parapets
A reporter states that during a parapet raising scheme over a mainline railway, a void up to 300mm deep was identified below existing coping bed level.
1 January 2018
CROSS Safety Report
Report ID: 635
Region: CROSS-UK
Columns missing due to 3D modelling
A new eight storey residential concrete frame building was being constructed and several columns were omitted from the ground and first floor level drawings, says a reporter.
1 January 2017
CROSS Safety Report
Report ID: 614
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Multi-storey car park foundations
Concerns are raised about the integrity of a completed car park structure following poor quality control procedures during construction.
1 October 2017
CROSS Safety Report
Report ID: 630
Region: CROSS-UK
Partial failure of precast concrete tank unit on installation
Concerns are raised after the foot of a precast concrete unit failed during installation, making the unit unstable.
1 April 2017
CROSS Safety Report
Report ID: 626
Region: CROSS-UK
Responsibilities for hybrid concrete construction
Concerns are raised after a substantial precast element, weighing over 10t, had been placed in position and used as part of the shuttering for an in-situ pour without it being designed to act as a shutter.
1 October 2016
CROSS Safety Report
Report ID: 574
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Concerns over unreinforced lighting column foundation
Concerns were raised on a major highway project after it was noticed that the contractor was casting a pad foundation with no reinforcement in the base.
1 July 2017
CROSS Safety Report
Report ID: 652
Region: CROSS-UK
Cantilever signal base failure - holding down bolts in bending
A railway asset owner noticed that a 9m cantilever signal structure was sagging alarmingly and stopped trains on the line to investigate the matter.
1 October 2017
CROSS Safety Report
Report ID: 627
Region: CROSS-UK
Tower crane foundation design error
Whilst carrying out an independent design check on a tower crane foundation design, a reporter discovered that the piles used on site did not have the required tension capacity.
1 July 2018
CROSS Safety Report
Report ID: 662
Region: CROSS-UK