Safety information search results
Filter your results
Building or structure type
- Bridges (2)
- Buildings
(53)
- Agricultural buildings (6)
- Car parks (2)
- Commercial (3)
- Education, science & art buildings (4)
- Health care (1)
- Industrial buildings (4)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Residential (15)
- Stadiums (1)
- Storage buildings (5)
- Tall buildings (4)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Freestanding walls (1)
- Railways (1)
- Retaining structures (3)
- Temporary structures (7)
Materials
Products
Project or lifecycle stage
Design
- Computational design (3)
- Design: quality management (10)
- Design calculations (19)
- Design conceptualisation (5)
- Design detailing (21)
- Design drawings (5)
- (-) Design loads (73)
- Design software (3)
- Dynamics (3)
- Fire safety design (2)
- Resilience (9)
- Robustness (8)
- Structural design (23)
- Sustainability (2)
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (4)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (21)
- Demolition project (1)
- Excavation (1)
- Extension project (4)
- New build (7)
- Refurbishment (3)
- Strengthening project (1)
- Structural assessment (5)
- Underpinning project (2)
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 23 (7)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (45)
- CROSS-US Newsletter 2 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (22)
- (-) CROSS Safety Report (73)
- News [sub-heading only] (4)
CROSS regions
Failure of existing long-span wood roof truss following installation of new roof-top HVAC units
Failure of an existing long-span wood roof truss following installation of new roof-top Heating, Ventilating, and Air Conditioning (HVAC) units offers lessons in the special challenges of renovations to existing buildings.
1 September 2020
CROSS Safety Report
Report ID: 949
Region: CROSS-US
Slipform temporary works design
A reporter was performing a CAT III check on a 14 storey slipform design when they discovered that the temporary works design was inadequate.
5 September 2022
CROSS Safety Report
Report ID: 809
Region: CROSS-UK
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK