Safety information search results
Filter your results
Building or structure type
- Bridges (25)
- Buildings
(190)
- Agricultural buildings (8)
- Car parks (6)
- Commercial (19)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (11)
- Health care (2)
- Higher-risk buildings (3)
- Industrial buildings (5)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (7)
- Recreational buildings (6)
- Residential (49)
- Stadiums (2)
- Storage buildings (6)
- Tall buildings (12)
- Theatres & other entertainment buildings (5)
- Transport buildings (2)
- Buried pipes & culverts (2)
- Floating structures (1)
- Freestanding walls (2)
- Marine structures (2)
- Masts & towers (7)
- Offshore structures (1)
- Railways (4)
- Reservoirs & dams (2)
- Retaining structures (14)
- Roads (5)
- Sewers (2)
- Temporary structures (14)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
- BIM (5)
- Computational design (12)
- Design: quality management (59)
- Design calculations (73)
- Design conceptualisation (26)
- Design detailing (82)
- Design drawings (28)
- Design loads (73)
- Design software (33)
- Dynamics (6)
- Fire safety design (11)
- Resilience (14)
- Robustness (34)
- Structural design (98)
- Sustainability (4)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (21)
- Assessment project [sub-heading only] (7)
- Conservation & restoration project (2)
- Construction project [sub-heading only] (102)
- Demolition project (1)
- Excavation (5)
- Extension project (13)
- Groundworks project (1)
- Maintenance project (3)
- New build (45)
- Refurbishment (14)
- Remediation project (11)
- Repair project (6)
- Strengthening project (3)
- Structural assessment (15)
- Underpinning project (2)
Construction period
Method of construction
Elements & systems
- Arch (2)
- Balconies (4)
- Balustrades (9)
- Basements (7)
- Beams (44)
- Bracing (12)
- Canopies (1)
- Ceilings (7)
- Cladding (19)
- Columns (26)
- Fasteners & connections (70)
- Fences (1)
- Fire protection (6)
- Foundations (16)
- Insulation (7)
- Light gauge steel framing (6)
- Padstones (2)
- Parapets (4)
- PV panels (3)
- Roofs (43)
- Sandwich panels (2)
- Shear walls (2)
- Signs (1)
- Slabs (26)
- Trusses (9)
- Walls (39)
- Wall ties (4)
Plant & equipment
Utilities
Safety reporting
Organisations
- CROSS-AUS [sub-heading only] (7)
- CROSS-UK [sub-heading only]
(29)
- Building Control Northern Ireland (2)
- Building Safety Regulator (BSR) (1)
- Environment Agency (1)
- Fire and Rescue Service (FRS) (2)
- Health and Safety Executive (HSE) (7)
- Local Authority Building Control (LABC) (11)
- Local Authority Building Standards Scotland (LABSS) (2)
- Scottish Environment Protection Agency (SEPA) (1)
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (2)
- CROSS-AUS Newsletter 3 (4)
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (10)
- CROSS-UK Newsletter 1 (4)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (4)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (3)
- CROSS-UK Newsletter 8 (3)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (3)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 20 (3)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (7)
- CROSS-UK Newsletter 33 (5)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (3)
- CROSS-UK Newsletter 37 (4)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (6)
- CROSS-UK Newsletter 42 (5)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (4)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (6)
- CROSS-UK Newsletter 55 (4)
- CROSS-UK Newsletter 56 (6)
- CROSS-UK Newsletter 57 (5)
- CROSS-UK Newsletter 58 (4)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK Newsletter 60 (5)
- CROSS-UK Newsletter 61 (3)
- CROSS-UK Newsletter 62 (5)
- CROSS-UK Newsletter 64 (4)
- CROSS-UK Newsletter 65 (5)
- CROSS-UK Newsletter 67 (5)
- CROSS-UK Newsletter 68 (4)
- CROSS-UK [sub-heading only] (160)
- CROSS-US Newsletter 1 (2)
- CROSS-US Newsletter 2 (3)
- CROSS-US [sub-heading only] (5)
- CROSS Newsletter (97)
- (-) CROSS Safety Report (289)
- News [sub-heading only] (38)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Maintenance of multi-storey buildings
A correspondent notes that the issues currently affecting several high-rise buildings in Australia are inevitably focused on design, construction, and certification; whereas there are other issues relating to ongoing inspection, maintenance, and (ultimately) demolition which seem to have been ignored.
1 February 2020
CROSS Safety Report
Report ID: 878
Region: CROSS-AUS
Dislodged finger plate on highway bridge
A correspondent received a report about a 1.5m long section of a steel finger plate expansion joint on a highway bridge that had been inadequately fixed and became dislodged.
1 February 2020
CROSS Safety Report
Report ID: 879
Region: CROSS-AUS
Unconservative design of flat slab due to software modelling issues
A reporter discusses how a design/modelling problem caused an under-designed reinforced concrete (RC) slab to be constructed.
1 April 2020
CROSS Safety Report
Report ID: 886
Region: CROSS-UK
Glazing design and horizontal barrier loading
A reporter shares problems they have encountered with barrier loading requirements on a curtain walling glazing system.
1 July 2020
CROSS Safety Report
Report ID: 899
Region: CROSS-UK
Principal designers’ obligations for temporary works
A correspondent believes that the new BS5975 standard places some onerous temporary work duties on the principal designer.
1 January 2020
CROSS Safety Report
Report ID: 870
Region: CROSS-UK
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS
Coliseum failure
This is a legacy case study of the 1978 collapse of the roof of the Hartford Coliseum in Hartford, Connecticut.
1 March 2020
CROSS Safety Report
Report ID: 892
Region: CROSS-US
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Emergency motorway lane closure during concrete repairs
This report highlights how confusion during concrete repair works led to an unplanned emergency lane closure of a bridge carrying a motorway.
1 July 2020
CROSS Safety Report
Report ID: 926
Region: CROSS-UK