Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (22)
- CROSS Newsletter (15)
- (-) CROSS Safety Report (35)
- News [sub-heading only] (4)
CROSS regions
Collapse of unsupported deep trench excavation
A worker was trapped within a partially collapsed excavation which was unsupported and not suitably benched.
1 October 2019
CROSS Safety Report
Report ID: 675
Region: CROSS-UK
Casting, transporting and installing precast concrete kerbs
A reporter shares their experience of how collaborative engineering thinking involving several parties enabled a design solution to be found that could be constructed safely.
1 October 2018
CROSS Safety Report
Report ID: 778
Region: CROSS-UK
Collapsed scaffolding
A reporter highlights how, following modest levels of snow fall in the winter, scaffolding erected in order to support a temporary roof collapsed inwards.
1 October 2019
CROSS Safety Report
Report ID: 730
Region: CROSS-UK
Questionable temporary works used to retain embankment excavation
This report is about the need for properly engineered retaining walls for all heights of retained materials.
1 June 2022
CROSS Safety Report
Report ID: 806
Region: CROSS-UK
Slipform temporary works design
A reporter was performing a CAT III check on a 14 storey slipform design when they discovered that the temporary works design was inadequate.
5 September 2022
CROSS Safety Report
Report ID: 809
Region: CROSS-UK