Set up of temporary works
This report highlights the importance of following correct procedures when installing temporary works.
1 July 2019
CROSS Safety Report
Report ID: 797
Region: CROSS-AUS
Lift pit excavation hazards
A reporter came across an unsafe deep excavation and asks how a geotechnical engineer views the risk of excavation collapse.
1 July 2019
CROSS Safety Report
Report ID: 821
Region: CROSS-AUS
Near miss when modifying brickwork
A reporter’s experience of creating a new door opening in an existing brick wall on the first floor of an old building is not always as simple as it would appear.
1 February 2020
CROSS Safety Report
Report ID: 847
Region: CROSS-AUS
Maintenance of multi-storey buildings
A correspondent notes that the issues currently affecting several high-rise buildings in Australia are inevitably focused on design, construction, and certification; whereas there are other issues relating to ongoing inspection, maintenance, and (ultimately) demolition which seem to have been ignored.
1 February 2020
CROSS Safety Report
Report ID: 878
Region: CROSS-AUS
Insufficient attention to the construction of tower crane bases
While working on construction sites a reporter was involved with tower crane bases supported on piles with pile caps and pedestals with cast-in anchors that had significant construction defects.
1 August 2020
CROSS Safety Report
Report ID: 920
Region: CROSS-AUS
Overloading metal decking in temporary state
During construction of steel structures with composite metal decking floors, a reporter has observed numerous occasions when the metal decking was close to being overloaded.
1 August 2020
CROSS Safety Report
Report ID: 919
Region: CROSS-AUS
GFRP reinforcement in concrete structures
A correspondent has become aware of work being undertaken in the field of glass fibre reinforced polymer (GFRP) reinforcement as a substitute for steel rebar in concrete structures and is deeply concerned by what they have observed.
1 August 2020
CROSS Safety Report
Report ID: 939
Region: CROSS-AUS
Collapse of a reinforcing cage
The reinforcing cage to a blade pier for an overpass bridge collapsed without warning when nearing completion.
1 August 2020
CROSS Safety Report
Report ID: 941
Region: CROSS-AUS
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.