Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- (-) CROSS-UK [sub-heading only] (12)
- CROSS Newsletter (6)
- CROSS Safety Report (12)
- News [sub-heading only] (4)
CROSS regions
Wind on internal masonry walls during construction
There has been a generic report from a contractor about internal masonry walls during construction following his experiences of failures.
1 October 2007
CROSS Safety Report
Report ID: 82
Region: CROSS-UK
Wall reinforcement cages collapse
A contractor says that they have experienced two cases of wall reinforcement cages collapsing.
1 April 2013
CROSS Safety Report
Report ID: 357
Region: CROSS-UK
Erecting reinforcement cages
A reporter asks about best practice guidance for the installation of pre-assembled reinforcement cages, as he can find very little guidance on the web.
1 April 2013
CROSS Safety Report
Report ID: 327
Region: CROSS-UK
Lack of experience on steel column erection
A reporter highlights how works progressed on site without a detailed method statement being provided by the contractor even though it had been requested.
1 April 2013
CROSS Safety Report
Report ID: 324
Region: CROSS-UK
Basement party walls
The client's consulting engineer had designed a new basement but, when queried by the consulting engineer for the main contractor, was unable to provide survey information for the adjoining property.
1 January 2014
CROSS Safety Report
Report ID: 361
Region: CROSS-UK
Stability of existing structures impacting construction sites
A reporter discusses the clients and principal contractors duties regarding the stability of existing structures on site, particularly those scheduled for demolition.
1 January 2018
CROSS Safety Report
Report ID: 693
Region: CROSS-UK
Lack of method statements on domestic projects
A reporter has observed that where an opening is being formed on domestic properties for, say a rear extension, that the builders tend to remove the masonry and follow up with the temporary propping.
1 January 2019
CROSS Safety Report
Report ID: 757
Region: CROSS-UK
Bridge bearing design and installation - further concerns raised
A reporter says that the issue of successful co-ordination between designers, contractors and specialist bearing suppliers is one they have experienced.
1 January 2019
CROSS Safety Report
Report ID: 796
Region: CROSS-UK
Padstones out of position leads to collapse
This report concerns the partial collapse of a terrace of four storey houses during construction due to padstones being placed incorrectly.
1 April 2017
CROSS Safety Report
Report ID: 602
Region: CROSS-UK
Collapse of unsupported deep trench excavation
A worker was trapped within a partially collapsed excavation which was unsupported and not suitably benched.
1 October 2019
CROSS Safety Report
Report ID: 675
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.