Safety information search results
Filter your results
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Unsafe design of retrofit cantilever balconies
A structural assessment of a number of new balconies being added to an existing building revealed critical concerns in respect of fixings back into the existing brickwork.
26 August 2022
CROSS Safety Report
Report ID: 1128
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Incorrect modelling of a cantilever
A steel framed building was incorrectly modelled and designed resulting in excessive deflection of part of the frame even before the frame was loaded with the self-weight of the building.
17 November 2022
CROSS Safety Report
Report ID: 1144
Region: CROSS-UK
Further example of incorrect finite element modelling
Concerns in respect of the sufficiency of finite element modelling of masonry walls as part of a reinforced concrete framed building.
20 February 2023
CROSS Safety Report
Report ID: 1145
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Design deficiencies in calculations submitted to a Local Authority
A Local Authority Building Control manager has sent a list which gives twenty nine of the more serious design review queries raised by the building control structural checking process over the last five years.
1 October 2010
CROSS Safety Report
Report ID: 210
Region: CROSS-UK
Bridge bearing design and installation - further concerns raised
A reporter says that the issue of successful co-ordination between designers, contractors and specialist bearing suppliers is one they have experienced.
1 January 2019
CROSS Safety Report
Report ID: 796
Region: CROSS-UK
Steelwork connection design
A reporter is concerned that on small domestic projects, steelwork fabricators are appointed who do not have the expertise to design connections or prepare fabrication drawings.
1 October 2013
CROSS Safety Report
Report ID: 393
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.