Safety information search results
Filter your results
Building or structure type
- Bridges (12)
- Buildings
(71)
- Commercial (11)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (6)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (3)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (4)
- Residential (17)
- Stadiums (2)
- Tall buildings (3)
- Theatres & other entertainment buildings (4)
- Transport buildings (1)
- Car parks (2)
- Flats & apartments (4)
- Houses (8)
- Masts & towers (2)
- Railways (1)
- Retaining structures (2)
- Temporary structures (1)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (7)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (37)
- Excavation (1)
- Extension project (4)
- New build (17)
- Refurbishment (6)
- Remediation project (5)
- Repair project (1)
- Strengthening project (2)
- Structural assessment (4)
- Underpinning project (1)
Method of construction
Elements & systems
- Balconies (3)
- Balustrades (3)
- Basements (1)
- Beams (22)
- Bracing (3)
- Canopies (1)
- Ceilings (1)
- Cladding (12)
- Columns (13)
- Fasteners & connections (35)
- Fire protection (3)
- Foundations (2)
- Insulation (5)
- Light gauge steel framing (3)
- Padstones (2)
- Parapets (4)
- Roofs (11)
- Signs (1)
- Slabs (8)
- Trusses (4)
- Walls (11)
- Wall ties (2)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (38)
- CROSS-US Newsletter 1 (2)
- CROSS-US Newsletter 2 (1)
- CROSS-US [sub-heading only] (3)
- CROSS Newsletter (23)
- CROSS Safety Alert (1)
- CROSS Safety Report (83)
- News [sub-heading only] (6)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Failure to grout steel frame bases
A reporter describes a problem that arose during the construction stage of a project when a steel frame supporting pipe and cable racks was loaded before the frame baseplates were grouted.
24 May 2023
CROSS Safety Report
Report ID: 1190
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Punching shear design spreadsheets
This is a technical note from a reporter about the methods their firm uses for punching shear design because there was concern about punching shear design spreadsheets possibly leading to potentially unsafe situations. .
28 March 2023
CROSS Safety Report
Report ID: 830
Region: CROSS-UK
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
Provision for movement in clay brickwork facades
A reporter raises concerns over the detailing and construction of horizontal movement joints in clay brickwork facades.
2 February 2023
CROSS Safety Report
Report ID: 860
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Concerns about punching shear in a flat slab
This report concerns potential shear failures in flat slabs. This originates from inconsistent design and detailing of the shear reinforcement where a proprietary shear link system is assumed in the design but not followed in detailing.
13 December 2021
CROSS Safety Report
Report ID: 1050
Region: CROSS-UK
Structural corrosion in a swimming pool building causes concern
A survey showed severe corrosion of previously repaired steelwork columns adjacent to a public swimming pool.
30 July 2021
CROSS Safety Report
Report ID: 1004
Region: CROSS-UK
Sudden failure of storage silo
A 5,000 ton capacity storage silo containing ground granulated blast-furnace slag (ggbs) split apart suddenly and without warning onsite at a concrete production facility.
14 December 2021
CROSS Safety Report
Report ID: 1045
Region: CROSS-UK