Safety information search results
Filter your results
Building or structure type
- Bridges (14)
- Buildings
(90)
- Commercial (12)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (9)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (3)
- Laboratory buildings (1)
- LPS buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (4)
- Residential (22)
- Stadiums (2)
- Tall buildings (5)
- Theatres & other entertainment buildings (4)
- Transport buildings (2)
- Car parks (4)
- Flats & apartments (6)
- Houses (9)
- Masts & towers (3)
- Railways (1)
- Retaining structures (2)
- Temporary structures (2)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (7)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (49)
- Excavation (1)
- Extension project (4)
- Fire safety assessment (1)
- New build (24)
- Refurbishment (6)
- Remediation project (7)
- Repair project (1)
- Strengthening project (4)
- Structural assessment (6)
- Underpinning project (1)
Method of construction
Elements & systems
- Balconies (5)
- Balustrades (5)
- Basements (1)
- Beams (27)
- Bracing (3)
- Canopies (3)
- Ceilings (2)
- Cladding (16)
- Columns (16)
- Fasteners & connections (47)
- Fire protection (4)
- Foundations (7)
- Insulation (5)
- Light gauge steel framing (4)
- Padstones (3)
- Parapets (4)
- Roofs (12)
- Shear walls (2)
- Signs (1)
- Slabs (9)
- Trusses (4)
- Wall head restraints (1)
- Walls (13)
- Wall ties (3)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Business practice
Theme pages
Content type
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (4)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (55)
- CROSS-US Newsletter 1 (2)
- CROSS-US Newsletter 2 (3)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (5)
- CROSS Newsletter (36)
- CROSS Safety Alert (2)
- CROSS Safety Report (111)
- News [sub-heading only] (9)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Concerns with propping design to large excavations
Concerns are raised about the design of propping to large excavations and particularly about the design of the connections for a raking prop to a horizontal waler.
1 January 2019
CROSS Safety Report
Report ID: 298
Region: CROSS-UK
Design deficiencies in long span steelwork portal
A firm commissioned to design steel joints on a large portal frame structure noticed that there was lack of restraint to a series of long span rafters.
1 October 2013
CROSS Safety Report
Report ID: 329
Region: CROSS-UK
Nuts falling from tension glazing system
A reporter raises concerns about the fixings used in a tension glazing system.
1 July 2013
CROSS Safety Report
Report ID: 340
Region: CROSS-UK
Further concerns about competence
A reporter raises concerns about competency, and the points raised demonstrate, says the reporter, a poor grasp first-principles on the part of many designers.
1 July 2013
CROSS Safety Report
Report ID: 339
Region: CROSS-UK
Steel stud failures during bridge construction
This report concerns the failure of a steel studs during construction works on a new bridge associated with major road improvements.
1 October 2012
CROSS Safety Report
Report ID: 332
Region: CROSS-UK
Timber roof truss bracing problem
Lateral movement of the roof tiles on a two-storey mid-terrace house built approximately 35 years ago with a trussed rafter roof led to the discovery of broken bracing.
1 July 2014
CROSS Safety Report
Report ID: 354
Region: CROSS-UK
Compatibility at RC column to slab joint - strong column/weak slab
A reporter who was reviewing the structural design of a commercial building raises concerns over the compatibility at column/slab joints when different grades of concrete are used.
1 April 2012
CROSS Safety Report
Report ID: 296
Region: CROSS-UK
School roof timber truss collapse
A gym/assembly hall roof to a school collapsed suddenly and without warning overnight when fortunately the building was unoccupied.
1 January 2012
CROSS Safety Report
Report ID: 249
Region: CROSS-UK
Dangerous snow slides from 100 houses
A reporter raises concerns about the build up of snow on cold roof systems.
1 July 2011
CROSS Safety Report
Report ID: 246
Region: CROSS-UK
Unsuitable underpinning
When reviewing a consulting engineer’s proposal to underpin a party wall, the reporter noticed that there was insufficient vertical load to maintain stability under lateral load from the retained height of soil.
1 July 2010
CROSS Safety Report
Report ID: 175
Region: CROSS-UK