Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK [sub-heading only] (4)
- CROSS Newsletter (4)
- CROSS Safety Alert (1)
- CROSS Safety Report (12)
- CROSS Topic Paper (1)
- News [sub-heading only] (2)
- Third party content (1)
- Third party content (1)
CROSS regions
Fire protection to car park steel frame
A reporter is concerned about the fire protection of a steel framed car park above a retail unit.
26 August 2022
CROSS Safety Report
Report ID: 1007
Region: CROSS-UK
Professional indemnity insurance issues raise safety concerns
Several reporters have raised concerns in relation to significant cost increases and the introduction of new restrictions on professional indemnity insurance (PII) policies.
13 August 2021
CROSS Safety Report
Report ID: 1022
Region: CROSS-UK
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Structural fire safety when responding to the climate emergency
Luke Bisby urges structural engineers to improve their understanding of ‘fire resistance’ as the profession looks to innovate rapidly in response to climate change.
1 February 2021
Third party content
Publisher: The Institution of Structural Engineers
Torre Windsor building fire - Madrid
The 30 storey Torre Windsor office building consisted of a reinforced concrete frame and steel load-bearing mullions around the perimeter.
1 June 2005
CROSS Topic Paper
Region: CROSS-UK
Fire in multi-storey car parks
The severe fire at the Liverpool Echo Arena MSCP on 31st December 2017 gutted the seven-storey building and up to 1,400 cars were destroyed.
1 February 2018
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Corrosion of fixings securing fire resisting plasterboard
A reporter sent pictures from a site where metal plasterboard fixings had deteriorated not long after installation.
1 July 2014
CROSS Safety Report
Report ID: 375
Region: CROSS-UK
Industry not reacting to failures
As legislation is reviewed, this report questions the appetite for change in the wake of the Grenfell Tower fire.
1 July 2019
CROSS Safety Report
Report ID: 798
Region: CROSS-UK
Fire resistance of multi-storey car parks
A reporter visited a recently constructed car park which contained some of the same design issues discussed in the February 2018 Standing Committee on Structural Safety (SCOSS) Alert on Fire in Multi-Storey Car Parks.
1 October 2019
CROSS Safety Report
Report ID: 857
Region: CROSS-UK
Glazing design and horizontal barrier loading
A reporter shares problems they have encountered with barrier loading requirements on a curtain walling glazing system.
1 July 2020
CROSS Safety Report
Report ID: 899
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.