Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (31)
- CROSS Newsletter (25)
- CROSS Safety Report (51)
- News [sub-heading only] (10)
CROSS regions
Scaffold lifting beams incorrectly installed
During the inspection of scaffolding prior to loading, it was observed that there were lifting beams with end stops and ultimate stop cross bolts incorrectly installed.
1 January 2018
CROSS Safety Report
Report ID: 702
Region: CROSS-UK
Inadequate structural design for domestic properties
A reporter has recently been asked to redesign several projects for domestic extensions/alterations, where two structural problems were found.
1 January 2018
CROSS Safety Report
Report ID: 703
Region: CROSS-UK
Bridge bearing design and installation - further concerns raised
A reporter says that the issue of successful co-ordination between designers, contractors and specialist bearing suppliers is one they have experienced.
1 January 2019
CROSS Safety Report
Report ID: 796
Region: CROSS-UK
Retaining wall excavation collapse
A 6m deep excavation formed for constructing a retaining wall on a domestic project collapsed due to insufficient propping.
1 July 2019
CROSS Safety Report
Report ID: 800
Region: CROSS-UK
Failure of waling beam connected to raking prop
A reporter discusses how they witnessed the failure of a temporary support for an excavation on site due to similar design issues discussed in CROSS report 298 (Props to large excavations).
1 July 2019
CROSS Safety Report
Report ID: 813
Region: CROSS-UK
Repeating the same design mistakes
A correspondent who investigates engineering failures has shared common errors which engineers keep repeating.
1 October 2019
CROSS Safety Report
Report ID: 858
Region: CROSS-UK
No structural design for steel portal frame building
A reporter is concerned that, in some cases, no structural design is carried out for steel portal framed buildings.
1 January 2020
CROSS Safety Report
Report ID: 866
Region: CROSS-UK
Rotting of cross-laminated timber (CLT) roof panels
This report highlights how a reporter discovered rotted CLT roof panels during the investigation of a roof that had been leaking for a few years.
1 October 2019
CROSS Safety Report
Report ID: 852
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Execution not matching design assumptions
This report highlights how the connection of steel columns to twin beams acting as a transfer beam was overlooked and created an eccentric loading condition.
14 October 2020
CROSS Safety Report
Report ID: 968
Region: CROSS-UK