Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 5 (1)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (16)
- CROSS Newsletter (9)
- CROSS Safety Alert (1)
- CROSS Safety Report (37)
- News [sub-heading only] (2)
CROSS regions
Water ingress to cross-laminated timber structural frame
In an eight year old building that included cross-laminated timber construction, it was found that water penetration had caused parts of the structure to rot.
6 June 2022
CROSS Safety Report
Report ID: 1124
Region: CROSS-UK
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Inadequate modelling of existing building
An existing building suffered damage while being upgraded, which led to a more detailed inspection of the existing building’s condition. The report highlights the importance of conducting a thorough investigation and assessment of an existing building structure to ensure an understanding of how it will perform under the applied design loads, rather than relying on assumptions that may be unre...
30 March 2023
CROSS Safety Report
Report ID: 1082
Region: CROSS-AUS
Cladding failure in strong winds
A reporter writes with concerns about a repeat failure of building cladding, in severe but not exceptional winds, that saw panels fall to the public street below.
17 February 2023
CROSS Safety Report
Report ID: 1172
Region: CROSS-UK
Incorrectly fixed sheets blow off parapet
This report concerns aluminium coping sheets that blew off the parapet of a block of flats under construction. The reporter says a fierce wind blew off several sheets which fell to the ground about 9m below. A building and a car were damaged but thankfully no one was hurt, although the potential for personal injury or death was significant.
25 May 2023
CROSS Safety Report
Report ID: 1180
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Metal cladding panels blowing in the wind
A local authority was called to investigate a dangerous structure where metal cladding panels on the 10th floor of a student accommodation block were flapping in high winds.
1 January 2015
CROSS Safety Report
Report ID: 461
Region: CROSS-UK
Cladding panel blown off
A reporter has become aware of an incident where a decorative cladding panel fell from an upper level of a multi-storey building in high winds.
1 October 2015
CROSS Safety Report
Report ID: 498
Region: CROSS-UK
Metal panel blown off roof
During some exceptionally gusty winds, a metal roof panel was blown off an office building roof onto a railway station roof below.
1 April 2016
CROSS Safety Report
Report ID: 537
Region: CROSS-UK
Nuts falling from tension glazing system
A reporter raises concerns about the fixings used in a tension glazing system.
1 July 2013
CROSS Safety Report
Report ID: 340
Region: CROSS-UK