- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 60 (4)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (23)
- CROSS Newsletter (17)
- CROSS Safety Alert (1)
- CROSS Safety Report (38)
- News [sub-heading only] (6)
CROSS regions
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Steel truss failure during lifting operation
The lifting operation for a 40m long span steel truss had to be abandoned after the localised failure of a joint.
13 December 2021
CROSS Safety Report
Report ID: 1035
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Concerns over structural design submissions
Concern was expressed about the standard of structural design submissions presented to local authorities.
1 November 2005
CROSS Safety Report
Report ID: 14
Region: CROSS-UK
Proper design and use of cold rolled steel frames
A reporter has been designing structures in cold rolled steel for approximately twenty years, mainly portal frame buildings, and some concerns.
1 January 2008
CROSS Safety Report
Report ID: 93
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Nuts falling from tension glazing system
A reporter raises concerns about the fixings used in a tension glazing system.
1 July 2013
CROSS Safety Report
Report ID: 340
Region: CROSS-UK
Further concerns about competence
A reporter raises concerns about competency, and the points raised demonstrate, says the reporter, a poor grasp first-principles on the part of many designers.
1 July 2013
CROSS Safety Report
Report ID: 339
Region: CROSS-UK
Concern about bridge hangers
A reporter is concerned that a failure in recent years involving the cast connections at each end of vertical bars, which connected to a bow string arch at one end and to a bridge deck at the other, may be in use elsewhere.
1 July 2012
CROSS Safety Report
Report ID: 222
Region: CROSS-UK