Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Fire incident response
Method of construction
Elements & systems
- Balconies (4)
- Balustrades (9)
- Beams (20)
- Bracing (4)
- Cables (3)
- Canopies (1)
- Ceilings (1)
- Cladding (8)
- Columns (9)
- (-) Fasteners & connections (88)
- Foundations (6)
- Insulation (2)
- Light gauge steel framing (4)
- Padstones (1)
- Parapets (3)
- PV panels (1)
- Roofs (4)
- Slabs (1)
- Tendons (1)
- Trusses (3)
- Walls (5)
- Wall ties (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (4)
- CROSS-UK Newsletter 1 (4)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 60 (4)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (51)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (32)
- CROSS Safety Alert (1)
- CROSS Safety Report (87)
- News [sub-heading only] (14)
CROSS regions
Incorrect fabrication of balustrade connection
A reporter describes how threaded bars were incorrectly used for a balustrade fixing instead of bolts which led to failure of the connection.
6 April 2023
CROSS Safety Report
Report ID: 851
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Accelerated corrosion of telecoms mast holding down bolts
During an examination of a 20m high telecoms mast, a reporter found that there had been accelerated corrosion of the galvanised holding down bolts.
1 June 2022
CROSS Safety Report
Report ID: 773
Region: CROSS-UK
Galvanic (bimetallic) corrosion not considered in cladding design
A cladding designer and installer did not consider galvanic (bimetallic) corrosion which led to remedial works being required.
30 June 2022
CROSS Safety Report
Report ID: 811
Region: CROSS-UK
Collapse of unusual hybrid concrete and steel strand truss on school roof
This report concerns the collapse of a school hall roof which resulted from the failure of one of a number of unusual hybrid concrete and steel strand trusses. The trusses consist of a precast reinforced concrete top chord and verticals with a bottom chord of tensioned steel strands. The failure of the truss resulted in the collapse of the supported flat roof local to the failed truss, and da...
25 May 2023
CROSS Safety Report
Report ID: 1227
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Latent shear stud defects
Shear studs appeared to be satisfactory when checked with the standard pull-over to five degrees but when hit with a hammer they snapped off.
1 November 2005
CROSS Safety Report
Report ID: 13
Region: CROSS-UK
Concerns over structural design submissions
Concern was expressed about the standard of structural design submissions presented to local authorities.
1 November 2005
CROSS Safety Report
Report ID: 14
Region: CROSS-UK
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK