Safety information search results
Filter your results
Building or structure type
Building height
Materials
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Non-structural roof soffit linings - failure
A reporter has observed the occurrence of compressed fibre cement sheets becoming dislodged from the soffit of several buildings in Australia.
1 January 2015
CROSS Safety Report
Report ID: 462
Region: CROSS-UK
Contractor varies structural design intention
A reporter was made aware by the building owner of an unauthorised structural alteration that had been made on site.
1 January 2015
CROSS Safety Report
Report ID: 420
Region: CROSS-UK
Post-fixed RC anchors - assumptions lead to unsafe design
A reporter raises concerns that engineers may be using post-fixed anchors without complying with the manufacturer's guidance or ensuring that their design assumptions are applicable.
1 January 2015
CROSS Safety Report
Report ID: 443
Region: CROSS-UK
Execution not matching design assumptions
This report highlights how the connection of steel columns to twin beams acting as a transfer beam was overlooked and created an eccentric loading condition.
14 October 2020
CROSS Safety Report
Report ID: 968
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.