Safety information search results
Filter your results
Building or structure type
- Bridges (15)
- Buildings
(89)
- Agricultural buildings (1)
- Commercial (11)
- Education, science & art buildings (8)
- Industrial buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (4)
- Residential (12)
- Storage buildings (1)
- Tall buildings (6)
- Theatres & other entertainment buildings (6)
- Transport buildings (3)
- Car parks (2)
- Flats & apartments (1)
- Houses (6)
- Masts & towers (11)
- Offshore structures (1)
- Railways (2)
- Retaining structures (2)
- Roads (1)
- Sewers (1)
- Temporary structures (5)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
Fire incident response
Method of construction
Elements & systems
- Balconies (4)
- Balustrades (6)
- Beams (14)
- Bracing (8)
- Cables (1)
- Canopies (2)
- Ceilings (18)
- Cladding (22)
- Columns (9)
- (-) Fasteners & connections (145)
- Fire protection (1)
- Foundations (10)
- Insulation (2)
- Light gauge steel framing (2)
- Parapets (2)
- PV panels (1)
- Roofs (14)
- Sandwich panels (1)
- Signs (1)
- Slabs (1)
- Trusses (6)
- Wall head restraints (1)
- Walls (7)
- Wall ties (4)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 17 (4)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (4)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (4)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (81)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (40)
- CROSS Safety Alert (4)
- CROSS Safety Report (140)
- News [sub-heading only] (18)
- Third party article (1)
- Third party content (1)
CROSS regions
Structural bolts and CE marking - advice wanted
A reporter seeks advice in relation to the required documents for purchasing and using structural bolts.
1 April 2014
CROSS Safety Report
Report ID: 416
Region: CROSS-UK
Fixings related to 395 partial roof collapse at shopping centre
A reporter shares their own experience and concerns after reading report 395 which discussed the partial roof collapse at a shopping centre.
1 January 2015
CROSS Safety Report
Report ID: 422
Region: CROSS-UK
Contractor varies structural design intention
A reporter was made aware by the building owner of an unauthorised structural alteration that had been made on site.
1 January 2015
CROSS Safety Report
Report ID: 420
Region: CROSS-UK
Failure of anchor bolts holding suspended scaffold
During the removal of a suspended scaffold, it was found that a number of the screw bolt anchors had failed.
1 July 2015
CROSS Safety Report
Report ID: 430
Region: CROSS-UK
Structural steel - reinforced concrete interface
A reporter describes how the substructure of a building was constructed out of position to the extent that the steel frame could not be erected to tolerance and could not be connected to the holding down bolts.
1 March 2006
CROSS Safety Report
Report ID: 19
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Liquid metal assisted cracking
Large cracks appeared down the sides of gusset welds after a truss was erected on site.
1 November 2006
CROSS Safety Report
Report ID: 49
Region: CROSS-UK
Unsafe street lighting columns
A reporter raises concerns over the poor construction of street light poles and advertisement boards.
1 April 2009
CROSS Safety Report
Report ID: 98
Region: CROSS-UK
Incorrect use of timber joist hanger
A reporter has become aware of another collapse resulting from the incorrect use of proprietary timber joist hangers in housing construction.
1 January 2008
CROSS Safety Report
Report ID: 95
Region: CROSS-UK
Collapse of brickwork cladding
The external leaf of a brickwork pier at first floor level fell down onto the playground of a school adjacent to the main entrance door.
1 October 2007
CROSS Safety Report
Report ID: 84
Region: CROSS-UK