Safety information search results
Filter your results
Building or structure type
Materials
Products
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (3)
- Assessment project [sub-heading only] (5)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (30)
- Demolition project (5)
- New build (21)
- Refurbishment (2)
- Remediation project (4)
- Repair project (2)
- Strengthening project (1)
- Structural assessment (8)
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (3)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 58 (5)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (28)
- CROSS Newsletter (16)
- CROSS Safety Report (60)
- News [sub-heading only] (5)
CROSS regions
Design and erection of prefabricated (precast) concrete
A correspondent considers that there should always be an experienced temporary works designer for prefabricated concrete structures as many structural engineers do not consider the erection methodology when designing such structures.
1 February 2020
CROSS Safety Report
Report ID: 871
Region: CROSS-AUS
Reinforced autoclaved aerated concrete roof planks - sharing experiences
A reporter has surveyed a number of buildings with reinforced autoclaved aerated concrete (RAAC) roof planks and wants to share their experiences to help others.
1 April 2020
CROSS Safety Report
Report ID: 874
Region: CROSS-UK, CROSS-AUS, CROSS-US
Post-tensioned slab failure during tendon stressing operations
A reporter disseminates the lessons learned after the end of a slab burst while stressing the tendons in a post-tensioned concrete slab.
1 April 2020
CROSS Safety Report
Report ID: 882
Region: CROSS-UK
Inadequate punching shear reinforcement in flat slabs
This report highlights how remedial works were required in a number of residential buildings after inadequate punching shear reinforcement was identified.
14 October 2020
CROSS Safety Report
Report ID: 950
Region: CROSS-UK
GFRP reinforcement in concrete structures
A correspondent has become aware of work being undertaken in the field of glass fibre reinforced polymer (GFRP) reinforcement as a substitute for steel rebar in concrete structures and is deeply concerned by what they have observed.
1 August 2020
CROSS Safety Report
Report ID: 939
Region: CROSS-AUS
Fire risks in multi-storey car parks
A reporter is concerned by the reluctance of the industry to voluntarily take on board and proactively react to the lessons learnt from the fire at the Echo Arena car park in Liverpool.
14 October 2020
CROSS Safety Report
Report ID: 940
Region: CROSS-UK
Shear failure during demolition
A reporter raises concerns about how a number of buildings being demolished ‘top-down’ have suffered from partial collapse during the process.
1 January 2016
CROSS Safety Report
Report ID: 523
Region: CROSS-UK
Columns missing due to 3D modelling
A new eight storey residential concrete frame building was being constructed and several columns were omitted from the ground and first floor level drawings, says a reporter.
1 January 2017
CROSS Safety Report
Report ID: 614
Region: CROSS-UK
Failure of prestressed hollowcore units during lifting
A reporter raises concerns about how prestressed hollowcore units can fail during lifting if not carefully designed, planned, and managed.
1 October 2018
CROSS Safety Report
Report ID: 749
Region: CROSS-UK
Failure of prestressed hollowcore units during storage and transport
A reporter shares their experience of the failure of prestressed hollowcore units during storage and transport.
1 June 2022
CROSS Safety Report
Report ID: 748
Region: CROSS-UK