Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Waterproofing exposed concrete slabs
This report highlights that water ingress into buildings continues to be a problem and discusses the role of the structural engineer when dealing with waterproofing of exposed concrete slabs. It shows how this can be achieved by careful design and detailing of the reinforced concrete structure and by close collaboration of all parties involved.
25 November 2021
CROSS Safety Report
Report ID: 959
Region: CROSS-AUS
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Submit a report