Safety information search results
Filter your results
Building or structure type
- Bridges (4)
- Buildings
(40)
- Commercial (4)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (2)
- Health care (1)
- Industrial buildings (1)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Residential (11)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (1)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Car parks (1)
- Flats & apartments (4)
- Houses (3)
- Masts & towers (2)
- Railways (2)
- Retaining structures (3)
- Roads (1)
- Sewers (1)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 4 (4)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (4)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (4)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (5)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK [sub-heading only] (37)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (30)
- CROSS Safety Report (61)
- News [sub-heading only] (7)
CROSS regions
Casting, transporting and installing precast concrete kerbs
A reporter shares their experience of how collaborative engineering thinking involving several parties enabled a design solution to be found that could be constructed safely.
1 October 2018
CROSS Safety Report
Report ID: 778
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Multi-storey car park foundations
Concerns are raised about the integrity of a completed car park structure following poor quality control procedures during construction.
1 October 2017
CROSS Safety Report
Report ID: 630
Region: CROSS-UK
Steel balconies fixed to precast hollowcore floor planks
A reporter is concerned about the suitability of providing a retrofitted steel balcony requiring moment connections to the sides of typical hollowcore floor planks.
1 July 2017
CROSS Safety Report
Report ID: 620
Region: CROSS-UK
Partial failure of precast concrete tank unit on installation
Concerns are raised after the foot of a precast concrete unit failed during installation, making the unit unstable.
1 April 2017
CROSS Safety Report
Report ID: 626
Region: CROSS-UK
Poor quality of construction and lack of supervision on a block of flats
Concerns are raised over poor quality construction and a lack of supervision on a residential block of flats.
1 July 2017
CROSS Safety Report
Report ID: 672
Region: CROSS-UK
Propping of post-tensioned slabs during construction
A reporter raises their concerns after an infill slab strip was not poured in time which resulted in overloading of the slab below during a concrete pour.
1 April 2020
CROSS Safety Report
Report ID: 873
Region: CROSS-UK
Defects in tapered thread reinforcement bars for coupling
A reporter highlights how B500 reinforcing bars were observed to have visually different tapered threads cut into the bars after delivered to site.
1 July 2019
CROSS Safety Report
Report ID: 844
Region: CROSS-UK
Checking reinforcement before concrete pours
A reporter shares their concerns about incorrect rebar positioning on site prior to concrete being poured.
1 July 2020
CROSS Safety Report
Report ID: 894
Region: CROSS-UK