Safety information search results
Filter your results
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 5 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (12)
- CROSS Newsletter (15)
- CROSS Safety Report (20)
- News [sub-heading only] (4)
CROSS regions
Incorrectly installed tension control bolts could have led to serious consequences
A reporter finds incorrectly installed system HRC preload bolt assemblies, better known as tension control bolts, during a site inspection of a new highway bridge over a railway. The incorrectly fitted bolts could have had major structural implications, and led to other safety risks, if the installation error had not been spotted.
24 May 2023
CROSS Safety Report
Report ID: 1196
Region: CROSS-UK
Fire risks in multi-storey car parks
A reporter is concerned by the reluctance of the industry to voluntarily take on board and proactively react to the lessons learnt from the fire at the Echo Arena car park in Liverpool.
14 October 2020
CROSS Safety Report
Report ID: 940
Region: CROSS-UK
Inadequate bolted connections supporting stairs
Concerns are raised over the safe design and installation of rolled steel angles (RSA) used to support heavy precast stair and landing units.
1 April 2017
CROSS Safety Report
Report ID: 615
Region: CROSS-UK
Contractor installs incorrect steel grade
A reporter came across an issue where the fabricator had used cold formed S235 commodity steel SHS rather than the specified hot formed S275 structural steel SHS.
1 April 2018
CROSS Safety Report
Report ID: 634
Region: CROSS-UK
Padstones out of position leads to collapse
This report concerns the partial collapse of a terrace of four storey houses during construction due to padstones being placed incorrectly.
1 April 2017
CROSS Safety Report
Report ID: 602
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Unconnected steel beam connection
A reporter describes how they came across a completely inadequate steel connection while attending site for another matter.
1 October 2017
CROSS Safety Report
Report ID: 646
Region: CROSS-UK
Architect conducts structural design of sway frame for domestic project
A reporter looked at a project recently where the drawings had been produced by the architect, including a structural design.
1 April 2018
CROSS Safety Report
Report ID: 678
Region: CROSS-UK
Serious safety failings of high level lattice girder walkways
A reporter discusses extremely serious safety failings with the construction of two new high level lattice girder walkways in the fly tower of a theatre.
1 January 2018
CROSS Safety Report
Report ID: 697
Region: CROSS-UK
Dangerous balcony construction
During an investigation of a balcony construction, a reporter discovered serious inadequacies related to a total lack of coordination between sub-contract work packages coupled with a lack of appropriate supervision.
1 January 2018
CROSS Safety Report
Report ID: 694