Safety information search results
Filter your results
Building or structure type
- Bridges (23)
- Buildings
(72)
- Commercial (5)
- Education, science & art buildings (8)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (4)
- LPS buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (4)
- Residential (7)
- Tall buildings (4)
- Theatres & other entertainment buildings (2)
- Transport buildings (5)
- Buried pipes & culverts (3)
- Car parks (10)
- Flats & apartments (4)
- Freestanding walls (3)
- Houses (1)
- Marine structures (2)
- Masts & towers (7)
- Offshore structures (1)
- Railways (8)
- Reservoirs & dams (1)
- Retaining structures (4)
- Roads (4)
- Temporary structures (3)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (1)
- Assessment project [sub-heading only] (16)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (17)
- Extension project (1)
- Fire safety assessment (1)
- Maintenance project (2)
- New build (4)
- Refurbishment (4)
- Remediation project (8)
- Repair project (4)
- Strengthening project (4)
- Structural assessment (22)
Construction period
Method of construction
Structural form
Elements & systems
- Arch (3)
- Balconies (5)
- Balustrades (4)
- Basements (1)
- Beams (9)
- Bracing (3)
- Cables (1)
- Canopies (2)
- Ceilings (7)
- Cladding (12)
- Columns (5)
- Fasteners & connections (28)
- Fences (1)
- Fire protection (2)
- Foundations (5)
- Insulation (1)
- Lintels (1)
- Parapets (3)
- Roofs (22)
- Signs (3)
- Slabs (12)
- Tendons (1)
- Trusses (2)
- Walls (11)
- Wall ties (1)
Temporary works
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (4)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 33 (5)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (3)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (53)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (32)
- CROSS Safety Alert (8)
- CROSS Safety Report (111)
- CROSS Topic Paper (5)
- News [sub-heading only] (10)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (2)
CROSS regions
Structural corrosion in a swimming pool building causes concern
A survey showed severe corrosion of previously repaired steelwork columns adjacent to a public swimming pool.
30 July 2021
CROSS Safety Report
Report ID: 1004
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Fatality from free standing wall collapse
A report was received from a local authority about a boundary wall to the front garden of a domestic property that collapsed suddenly resulting in the death of a child who was passing.
1 January 2008
CROSS Safety Report
Report ID: 59
Region: CROSS-UK
Precast concrete planks - durability and potential safety concerns
A reporter raises concerns over the recent collapses of precast concrete floor units that are installed throughout the UK.
1 April 2007
CROSS Safety Report
Report ID: 77
Region: CROSS-UK
Facade failure
Large pieces of granite fell without warning from a second floor opening.
1 February 2007
CROSS Safety Report
Report ID: 63
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Aerated concrete slabs
A reporter discusses the failure of precast reinforced autoclaved aerated concrete (RAAC) slabs during construction.
1 October 2007
CROSS Safety Report
Report ID: 55
Region: CROSS-UK, CROSS-AUS, CROSS-US
Long term risks for ground anchors
A reporter is concerned about the inspection and maintenance of ground anchors that are used for strategic flood defences.
1 October 2007
CROSS Safety Report
Report ID: 87
Region: CROSS-UK
Elliot Lake mall collapse
In June 2012 part of the roof of a thirty two year old Mall in Ontario, Canada collapsed killing two people and injuring nineteen.
1 December 2014
CROSS Topic Paper
Region: CROSS-UK