Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Method of construction
Elements & systems
- Arch (1)
- Balconies (2)
- Balustrades (4)
- Basements (2)
- Beams (7)
- Bracing (2)
- Canopies (1)
- Ceilings (1)
- Cladding (9)
- Columns (4)
- Fasteners & connections (20)
- Fences (1)
- Fire exit doors (1)
- Fire protection (2)
- Foundations (4)
- Insulation (1)
- Light gauge steel framing (1)
- Lintels (1)
- Padstones (1)
- Parapets (1)
- PV panels (1)
- Roofs (10)
- Shear walls (1)
- Slabs (5)
- Trusses (3)
- Walls (10)
- Wall ties (2)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (9)
- CROSS-UK Newsletter 64 (3)
- CROSS-UK Newsletter 67 (4)
- CROSS-UK Newsletter 68 (1)
- CROSS Newsletter (8)
- CROSS Review (18)
- CROSS Safety Report (94)
- CROSS Theme Page (1)
- Third party article (1)
- Third party content (3)
- Third party content (1)
- Third party report (1)
CROSS regions
Concern over structural engineers limited appointment
A reporter raises concerns over engineers being appointed only to provide calculations for building regulation approval.
2 February 2023
CROSS Safety Report
Report ID: 831
Region: CROSS-UK
Slipform temporary works design
A reporter was performing a CAT III check on a 14 storey slipform design when they discovered that the temporary works design was inadequate.
5 September 2022
CROSS Safety Report
Report ID: 809
Region: CROSS-UK
Has the role of building control changed?
A reporter raises a query about the role of Building Control.
5 September 2022
CROSS Safety Report
Report ID: 810
Region: CROSS-UK
Contractor notches steel transfer beam
A transfer beam with 50mm thick flanges supporting a four-storey building was notched, without approval from the design engineer, to accommodate suspended ceiling fixings.
29 March 2021
CROSS Safety Report
Report ID: 829
Region: CROSS-UK
Mesh flooring safety issues
A reporter has recently witnessed a number of safety issues with open grid mesh flooring.
10 February 2023
CROSS Safety Report
Report ID: 913
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Cost of access to codes and standards
A reporter is concerned that the latest codes may not always be being used because of price, and they believe that there should be free library access to British Standards to members of professional institutions.
13 December 2022
CROSS Safety Report
Report ID: 923
Region: CROSS-UK
Precast concrete panel fixing
A 1960s flyover was being demolished and an interesting feature came to light how the precast concrete edge panels were fixed.
30 June 2022
CROSS Safety Report
Report ID: 965
Region: CROSS-UK
The risk of collapse of multi-storey CLT buildings during a fire
A reporter presents concerns about the fire safety of multi-storey buildings comprised of cross-laminated timber (CLT) structures.
29 March 2021
CROSS Safety Report
Report ID: 966
Region: CROSS-UK
Storm damage to pressed metal roof covering
A modern dwelling with two separate V-shaped roofs sustained damage to the standing seam pressed metal roof covering during two separate weather events.
23 February 2024
CROSS Safety Report
Report ID: 952