Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Wind on internal masonry walls during construction
There has been a generic report from a contractor about internal masonry walls during construction following his experiences of failures.
1 October 2007
CROSS Safety Report
Report ID: 82
Region: CROSS-UK
Rebar cage temporary stability
A reporter describes how on two occasions, on different sites, 6m high rebar cages collapsed under wind loads.
1 October 2013
CROSS Safety Report
Report ID: 374
Region: CROSS-UK
Collapsed scaffolding
A reporter highlights how, following modest levels of snow fall in the winter, scaffolding erected in order to support a temporary roof collapsed inwards.
1 October 2019
CROSS Safety Report
Report ID: 730
Region: CROSS-UK