Safety information search results
Filter your results
Building or structure type
- Bridges (14)
- Buildings
(77)
- Agricultural buildings (2)
- Commercial (6)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (1)
- Higher-risk buildings (2)
- Industrial buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (3)
- Residential (25)
- Storage buildings (1)
- Tall buildings (4)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Buried pipes & culverts (1)
- Car parks (2)
- Flats & apartments (7)
- Floating structures (1)
- Hotels & hostels (1)
- Houses (10)
- Marine structures (1)
- Masts & towers (4)
- Railways (3)
- Reservoirs & dams (1)
- Retaining structures (5)
- Roads (2)
- Sewers (2)
- Temporary structures (5)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (19)
- Conservation & restoration project (1)
- (-) Construction project [sub-heading only] (103)
- Demolition project (1)
- Excavation (4)
- Extension project (11)
- Groundworks project (1)
- Maintenance project (3)
- New build (42)
- Refurbishment (12)
- Remediation project (11)
- Repair project (5)
- Strengthening project (3)
- Structural assessment (4)
- Underpinning project (2)
Method of construction
Elements & systems
- Arch (2)
- Balconies (2)
- Balustrades (4)
- Basements (4)
- Beams (22)
- Bracing (7)
- Ceilings (2)
- Cladding (11)
- Columns (15)
- Fasteners & connections (32)
- Fire protection (3)
- Foundations (9)
- Insulation (3)
- Light gauge steel framing (4)
- Padstones (1)
- Parapets (2)
- PV panels (1)
- Roofs (9)
- Sandwich panels (1)
- Shear walls (2)
- Signs (1)
- Slabs (13)
- Trusses (3)
- Walls (15)
- Wall ties (2)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Theme pages
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (3)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (4)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (5)
- CROSS-UK Newsletter 68 (4)
- CROSS-UK [sub-heading only] (49)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (36)
- CROSS Safety Report (103)
- News [sub-heading only] (13)
CROSS regions
Failure of prestressed hollowcore units during lifting
A reporter raises concerns about how prestressed hollowcore units can fail during lifting if not carefully designed, planned, and managed.
1 October 2018
CROSS Safety Report
Report ID: 749
Region: CROSS-UK
Add-on timber trussed roof to flat roof causes failure
A reporter discusses how, while visiting a property for an unrelated matter, they spotted something odd about the roof; the gable had bulged at one end and movement had clearly occurred.
1 October 2018
CROSS Safety Report
Report ID: 742
Region: CROSS-UK
Overall stability of building proposed to be provided by metal framing and plasterboard
Metal framing and plasterboard was used to provide lateral stability to a building. The form of construction was later deemed to be unsuitable and extensive remedial works had to be carried out.
24 May 2023
CROSS Safety Report
Report ID: 468
Region: CROSS-UK