Safety information search results
Filter your results
Building or structure type
- Bridges (32)
- Buildings
(235)
- Agricultural buildings (1)
- Commercial (19)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (9)
- Health care (3)
- Higher-risk buildings (1)
- Industrial buildings (3)
- Public, religious & civic buildings (6)
- Recreational buildings (5)
- Residential (65)
- Stadiums (2)
- Storage buildings (3)
- Tall buildings (7)
- Theatres & other entertainment buildings (6)
- Transport buildings (2)
- Buried pipes & culverts (2)
- Car parks (11)
- Flats & apartments (16)
- Freestanding walls (1)
- Hotels & hostels (1)
- Houses (34)
- Masts & towers (10)
- Railways (6)
- Reservoirs & dams (1)
- Retaining structures (23)
- Roads (7)
- Sewers (3)
- Temporary structures (27)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (3)
- Design: quality management (24)
- Design calculations (26)
- Design conceptualisation (11)
- Design detailing (59)
- Design drawings (22)
- Design loads (46)
- Design software (7)
- Dynamics (3)
- Fire safety design (8)
- Resilience (6)
- Robustness (22)
- Structural design (61)
- Sustainability (2)
Fire incident response
Project type
- Alteration & conversion project (22)
- Assessment project [sub-heading only] (7)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (177)
- Demolition project (4)
- Excavation (14)
- Extension project (12)
- Groundworks project (3)
- Maintenance project (2)
- New build (98)
- Refurbishment (9)
- Remediation project (13)
- Repair project (6)
- Strengthening project (4)
- Structural assessment (8)
- Underpinning project (3)
Construction period
Elements & systems
- Arch (2)
- Balconies (8)
- Balustrades (13)
- Basements (7)
- Beams (52)
- Bracing (14)
- Cables (1)
- Canopies (1)
- Ceilings (11)
- Cladding (24)
- Columns (27)
- Fasteners & connections (110)
- Fire protection (7)
- Foundations (30)
- Insulation (6)
- Light gauge steel framing (4)
- Lintels (3)
- Padstones (5)
- Parapets (4)
- PV panels (1)
- Roofs (35)
- Sandwich panels (1)
- Signs (3)
- Slabs (31)
- Tendons (1)
- Trusses (7)
- Wall head restraints (2)
- Walls (66)
- Wall ties (10)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (3)
- CROSS-UK Newsletter 4 (7)
- CROSS-UK Newsletter 5 (4)
- CROSS-UK Newsletter 6 (5)
- CROSS-UK Newsletter 7 (3)
- CROSS-UK Newsletter 8 (4)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 11 (3)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (4)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (2)
- CROSS-UK Newsletter 17 (3)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (4)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (5)
- CROSS-UK Newsletter 32 (6)
- CROSS-UK Newsletter 33 (4)
- CROSS-UK Newsletter 34 (6)
- CROSS-UK Newsletter 35 (6)
- CROSS-UK Newsletter 36 (3)
- CROSS-UK Newsletter 37 (5)
- CROSS-UK Newsletter 38 (6)
- CROSS-UK Newsletter 39 (5)
- CROSS-UK Newsletter 40 (3)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (9)
- CROSS-UK Newsletter 43 (5)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (4)
- CROSS-UK Newsletter 51 (5)
- CROSS-UK Newsletter 52 (6)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (6)
- CROSS-UK Newsletter 56 (5)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (6)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (2)
- CROSS-UK Newsletter 62 (4)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (3)
- CROSS-UK [sub-heading only] (240)
- CROSS-US Newsletter 1 (3)
- CROSS-US Newsletter 2 (3)
- CROSS-US Newsletter 3 (2)
- CROSS-US [sub-heading only] (6)
- CROSS Newsletter (146)
- CROSS Safety Alert (1)
- CROSS Safety Report (385)
- CROSS Topic Paper (3)
- News [sub-heading only] (47)
- Safety information from CROSS [sub-heading only] (1)
- Third party article (1)
- Third party content (1)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Object rolling into live carriageway
A disc of concrete rolled from a construction area onto a live carriageway, colliding with a passing vehicle.
6 June 2022
Report ID: 1089
Region: CROSS-UK
Tower crane base designs
A reporter’s firm has been involved in the design and checking of numerous tower crane bases and have come across many examples where the supplier of the tower crane has supplied incorrect loadings. These incorrect loadings could have led to crane failures had the errors not been spotted.
7 June 2022
CROSS Safety Report
Report ID: 1093
Region: CROSS-UK
Concern over modelling of concrete frame building for construction stage
Independent check shows inadequate modelling of concrete frame building with transfer slab.
10 March 2022
CROSS Safety Report
Report ID: 1073
Region: CROSS-UK
Dangerous building work on domestic project
Temporary propping fails during works to a semi-detached property putting the whole building at risk of collapse.
10 March 2022
CROSS Safety Report
Report ID: 1062
Region: CROSS-UK
Basement excavation under a semi-detached house causes collapse
Basement excavation under a semi-detached house causes a collapse.
10 March 2022
CROSS Safety Report
Report ID: 1063
Region: CROSS-UK
Excessive deflection of spliced steel beam
A long-span primary steel beam deflects excessively at its splice during concreting of the floor slab.
30 August 2022
CROSS Safety Report
Report ID: 1111
Region: CROSS-UK
Preparation of holes in concrete for chemical anchors
Reinforcement intended to be resin anchored into concrete was not anchored, because the resin did not cure, due to contamination within the holes.
6 June 2022
CROSS Safety Report
Report ID: 1096
Region: CROSS-UK
Specifying resin by colour causes confusion
A mistake occurred on-site when resin for fixings was selected by colour of packaging rather than by colour of resin. The actual resin used did not reach sufficient strength and the installed fixing failed under a pull test.
10 March 2022
CROSS Safety Report
Report ID: 1068
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.