Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (11)
- Assessment project [sub-heading only] (3)
- Conservation & restoration project (1)
- (-) Construction project [sub-heading only] (46)
- Demolition project (1)
- Excavation (1)
- Extension project (2)
- Maintenance project (3)
- New build (10)
- Refurbishment (7)
- Remediation project (12)
- Repair project (5)
- Strengthening project (4)
- Structural assessment (5)
Method of construction
Structural form
Elements & systems
- Arch (3)
- Balconies (2)
- Balustrades (5)
- Beams (4)
- Bracing (2)
- Ceilings (1)
- Cladding (6)
- Columns (1)
- Fasteners & connections (9)
- Fire protection (2)
- Insulation (2)
- Light gauge steel framing (1)
- Lintels (1)
- Parapets (2)
- PV panels (1)
- Roofs (6)
- Shear walls (1)
- Slabs (5)
- Wall head restraints (1)
- Walls (10)
- Wall ties (1)
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (4)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (3)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (24)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (16)
- CROSS Safety Report (46)
- News [sub-heading only] (4)
CROSS regions
Parapet wall collapse
The sudden failure of parapet coping stones on an old two storey industrial building caused the stones to fall onto a road and pavement below.
1 January 2018
CROSS Safety Report
Report ID: 711
Region: CROSS-UK
Who takes responsibility for preventing a failure?
After reading the safety alert on Hazard identification for structural design, a reporter shares their views how various parties involved with structural safety sometimes see their responsibilities.
1 July 2018
CROSS Safety Report
Report ID: 704
Region: CROSS-UK
Dangerous modification during construction of five storey block of flats
A reporter was asked to investigate a five storey timber framed block of flats after the leaseholder of the top floor reported gaps appearing between oak floorboards.
1 January 2018
CROSS Safety Report
Report ID: 699
Region: CROSS-UK
Dangerously defective glass smoke screens
A reporter was asked to investigate the spontaneous failure of glass smoke control screens at a major retail store.
1 July 2018
CROSS Safety Report
Report ID: 734
Region: CROSS-UK
Unsafe removal of internal walls
A reporter was requested to advise on the removal of some internal walls in a decades’ old multi storey block of council flats after they were removed.
1 October 2018
CROSS Safety Report
Report ID: 714
Region: CROSS-UK
Dangerous glass infill panels on balustrade
A reporter has expressed their concern about the structural stability of cantilever glass infill panels between a steel post and handrail balustrade system at a high-level apartment block.
1 January 2019
CROSS Safety Report
Report ID: 741
Region: CROSS-UK
Collapse of domestic glass balustrade due to inadequate fixings
A firm was asked to provide professional advice regarding the replacement of a glass balustrade which had collapsed.
1 July 2018
CROSS Safety Report
Report ID: 756
Region: CROSS-UK
Inadequate brick ties in gable walls
A reporter was called to council houses at four different sites, whose upper triangle of cavity wall brickwork on the gable end had fallen out, due to not being tied into the roof.
1 July 2019
CROSS Safety Report
Report ID: 785
Region: CROSS-UK
Inability of roller shutter doors to resist wind pressures
Concerns are raised after two sets of roller shutter doors failed within weeks of installation at winds far below the design pressures.
1 July 2017
CROSS Safety Report
Report ID: 663
Region: CROSS-UK
Failure to maintain roof drainage during re-roof leads to ponding stability collapse
A roof collapsed while the building’s roofing membrane was being replaced.
1 March 2020