Safety information search results
Filter your results
Building or structure type
- Bridges (31)
- Buildings
(182)
- Agricultural buildings (2)
- Commercial (11)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (4)
- Health care (1)
- Higher-risk buildings (2)
- Industrial buildings (7)
- LPS buildings (2)
- Public, religious & civic buildings (5)
- Recreational buildings (3)
- Residential (61)
- Stadiums (2)
- Storage buildings (3)
- Tall buildings (7)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Buried pipes & culverts (3)
- Car parks (4)
- Flats & apartments (16)
- Floating structures (1)
- Hotels & hostels (1)
- Houses (26)
- Marine structures (1)
- Masts & towers (8)
- Railways (7)
- Reservoirs & dams (1)
- Retaining structures (14)
- Roads (6)
- Sewers (4)
- Temporary structures (12)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (41)
- Assessment project [sub-heading only] (3)
- Conservation & restoration project (2)
- (-) Construction project [sub-heading only] (263)
- Demolition project (15)
- Excavation (16)
- Extension project (19)
- Groundworks project (3)
- Maintenance project (5)
- New build (104)
- Refurbishment (17)
- Remediation project (22)
- Repair project (9)
- Strengthening project (9)
- Structural assessment (7)
- Underpinning project (4)
Elements & systems
- Arch (4)
- Balconies (8)
- Balustrades (9)
- Basements (9)
- Beams (45)
- Bracing (13)
- Canopies (1)
- Ceilings (2)
- Cladding (13)
- Columns (30)
- Fasteners & connections (57)
- Fire protection (4)
- Foundations (31)
- Insulation (4)
- Light gauge steel framing (5)
- Lintels (3)
- Padstones (4)
- Parapets (4)
- PV panels (1)
- Roofs (17)
- Sandwich panels (1)
- Shear walls (5)
- Signs (1)
- Slabs (30)
- Tendons (1)
- Trusses (4)
- Wall head restraints (2)
- Walls (53)
- Wall ties (5)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (2)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (4)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS [sub-heading only] (9)
- CROSS-UK Newsletter 1 (4)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (4)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (3)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (3)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (3)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 34 (4)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (5)
- CROSS-UK Newsletter 41 (3)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (5)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (5)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (5)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (5)
- CROSS-UK Newsletter 68 (4)
- CROSS-UK [sub-heading only] (154)
- CROSS-US Newsletter 1 (3)
- CROSS-US Newsletter 2 (5)
- CROSS-US [sub-heading only] (7)
- CROSS Newsletter (100)
- CROSS Safety Report (262)
- News [sub-heading only] (34)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
Incorrect modelling of a cantilever
A steel framed building was incorrectly modelled and designed resulting in excessive deflection of part of the frame even before the frame was loaded with the self-weight of the building.
17 November 2022
CROSS Safety Report
Report ID: 1144
Region: CROSS-UK
Further example of incorrect finite element modelling
Concerns in respect of the sufficiency of finite element modelling of masonry walls as part of a reinforced concrete framed building.
20 February 2023
CROSS Safety Report
Report ID: 1145
Region: CROSS-UK
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK
Undermining shallow foundations
A reporter raises concerns about the tendency for existing shallow footings to be exposed and possibly undermined when adding extensions to older properties.
1 July 2010
CROSS Safety Report
Report ID: 196
Region: CROSS-UK