Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (12)
- CROSS Newsletter (10)
- CROSS Safety Report (17)
- News [sub-heading only] (3)
CROSS regions
Potentially dangerous excavation
A reporter has submitted this photograph of a potentially dangerous excavation.
1 July 2014
CROSS Safety Report
Report ID: 368
Region: CROSS-UK
Adjacent excavations in Australia
In parts of Australia, says a reporter, deep excavations in clay and sandy materials have caused damage to adjacent property and to existing buildings founded on high level footings.
1 July 2013
CROSS Safety Report
Report ID: 360
Region: CROSS-UK
Retaining wall excavation collapse
A 6m deep excavation formed for constructing a retaining wall on a domestic project collapsed due to insufficient propping.
1 July 2019
CROSS Safety Report
Report ID: 800
Region: CROSS-UK
Sudden hole in piling mat - update
This is further information about report 566 which highlighted how a sudden hole appeared in a piling mat.
1 October 2016
CROSS Safety Report
Report ID: 596
Region: CROSS-UK
Collapse of unsupported deep trench excavation
A worker was trapped within a partially collapsed excavation which was unsupported and not suitably benched.
1 October 2019
CROSS Safety Report
Report ID: 675
Region: CROSS-UK
Lift pit excavation hazards
A reporter came across an unsafe deep excavation and asks how a geotechnical engineer views the risk of excavation collapse.
1 July 2019
CROSS Safety Report
Report ID: 821
Region: CROSS-AUS
Failure of waling beam connected to raking prop
A reporter discusses how they witnessed the failure of a temporary support for an excavation on site due to similar design issues discussed in CROSS report 298 (Props to large excavations).
1 July 2019
CROSS Safety Report
Report ID: 813
Region: CROSS-UK