Safety information search results
Filter your results
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK [sub-heading only] (23)
- CROSS Newsletter (18)
- CROSS Safety Report (33)
- News [sub-heading only] (8)
CROSS regions
Responsibilities for hybrid concrete construction
Concerns are raised after a substantial precast element, weighing over 10t, had been placed in position and used as part of the shuttering for an in-situ pour without it being designed to act as a shutter.
1 October 2016
CROSS Safety Report
Report ID: 574
Region: CROSS-UK
Issues with imported steel
Defective steel, says a reporter, was found in a major retail store where the material had been imported from a supplier overseas.
1 October 2014
CROSS Safety Report
Report ID: 474
Region: CROSS-UK
Columns missing due to 3D modelling
A new eight storey residential concrete frame building was being constructed and several columns were omitted from the ground and first floor level drawings, says a reporter.
1 January 2017
CROSS Safety Report
Report ID: 614
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Settlement of driven piles
A railway platform was constructed on piled foundations and it was noticed that one pair of piles and their associated cross head settled soon afterwards.
1 April 2017
CROSS Safety Report
Report ID: 607
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Missing punching shear reinforcement in concrete slabs
A reporter raises concerns of how two separate engineers observed the omission of design punching shear reinforcement prior to slab pours being undertaken on two different sites.
1 April 2020
CROSS Safety Report
Report ID: 906
Region: CROSS-UK
Contractor uses incorrect fixing bolts for masonry support angles
A correspondent noticed that proprietary masonry support angles specified to support the outer leaf of masonry had been incorrectly connected to the steel beam using carriage bolts.
1 July 2019
CROSS Safety Report
Report ID: 794
Region: CROSS-UK
Propping of post-tensioned slabs during construction
A reporter raises their concerns after an infill slab strip was not poured in time which resulted in overloading of the slab below during a concrete pour.
1 April 2020
CROSS Safety Report
Report ID: 873
Region: CROSS-UK
Execution not matching design assumptions
This report highlights how the connection of steel columns to twin beams acting as a transfer beam was overlooked and created an eccentric loading condition.
14 October 2020
CROSS Safety Report
Report ID: 968
Region: CROSS-UK