Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (2)
- Assessment project [sub-heading only] (6)
- Construction project [sub-heading only] (29)
- Demolition project (4)
- Excavation (4)
- Extension project (2)
- Fire safety assessment (2)
- Groundworks project (1)
- New build (10)
- Refurbishment (1)
- Remediation project (1)
- Repair project (1)
- Strengthening project (1)
- Structural assessment (6)
Method of construction
Structural form
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (3)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (38)
- CROSS Newsletter (19)
- CROSS Safety Alert (7)
- CROSS Safety Report (58)
- CROSS Topic Paper (12)
- News [sub-heading only] (9)
- Safety information from CROSS [sub-heading only] (2)
CROSS regions
Decorative lights and banners can damage buildings
A reporter raises concerns about large banners and decorative lights that are often put up and attached to buildings without any thought given to the engineering considerations.
1 October 2009
CROSS Safety Report
Report ID: 159
Region: CROSS-UK
Check for errata when using manuals
A reporter from an international firm of consulting engineers noticed an alert on a global internal knowledge networks about an errata in an AISC manual.
1 April 2011
CROSS Safety Report
Report ID: 211
Region: CROSS-UK
Effect of staff change on a design
A reporter illustrates how risk can be generated from staff turnover.
1 October 2012
CROSS Safety Report
Report ID: 277
Region: CROSS-UK
Falsework support to a bridge – a near miss
This report follows the near collapse of a birdcage scaffold falsework structure during an 800 cubic metre concrete pour on a motorway bridge.
1 October 2012
CROSS Safety Report
Report ID: 333
Region: CROSS-UK
Erecting reinforcement cages
A reporter asks about best practice guidance for the installation of pre-assembled reinforcement cages, as he can find very little guidance on the web.
1 April 2013
CROSS Safety Report
Report ID: 327
Region: CROSS-UK
Lack of experience on steel column erection
A reporter highlights how works progressed on site without a detailed method statement being provided by the contractor even though it had been requested.
1 April 2013
CROSS Safety Report
Report ID: 324
Region: CROSS-UK
Deficiencies on access scaffold
Investigation by a reporter’s firm into an access scaffold on a refurbishment contract on a city centre site brought to light a number of deficiencies which rendered the scaffold out with its design parameters.
1 April 2011
CROSS Safety Report
Report ID: 219
Region: CROSS-UK
Alterations to existing buildings with no site visits
A reporter is concerned about structural engineers developing structural calculations and drawings based on the Architects’ drawings only, with no site visits.
1 January 2014
CROSS Safety Report
Report ID: 365
Region: CROSS-UK
Wall reinforcement cages collapse
A contractor says that they have experienced two cases of wall reinforcement cages collapsing.
1 April 2013
CROSS Safety Report
Report ID: 357
Region: CROSS-UK
Basement party walls
The client's consulting engineer had designed a new basement but, when queried by the consulting engineer for the main contractor, was unable to provide survey information for the adjoining property.
1 January 2014
CROSS Safety Report
Report ID: 361
Region: CROSS-UK