Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Project type
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Content type
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 61 (2)
- CROSS-UK Newsletter 62 (6)
- CROSS-UK Newsletter 64 (5)
- CROSS-UK Newsletter 65 (5)
- CROSS-UK Newsletter 67 (5)
- CROSS-UK Newsletter 68 (6)
- CROSS-UK [sub-heading only] (16)
- CROSS Feature Article (1)
- CROSS Newsletter (18)
- CROSS Safety Alert (5)
- CROSS Safety Report (86)
- CROSS Theme Page (1)
- CROSS Topic Paper (3)
- News [sub-heading only] (2)
- Third party content (3)
- Third party content (1)
CROSS regions
Fire protection of stair structure
A reporter is concerned about the lack of structural fire protection in a fire escape stair.
10 March 2022
CROSS Safety Report
Report ID: 1028
Region: CROSS-UK
Concern over the quality of a fire safety design submission
A Building Control Officer is disquieted by the quality of a design submission and the respective approach of a fire engineer in assessing structural fire matters.
17 November 2022
CROSS Safety Report
Report ID: 1029
Region: CROSS-UK
Fire compartmentation detailing issues
Two reports have been received concerning fire compartmentation detailing issues; one on the incorrect installation of fire batts and the other on the incorrect use of intumescent material.
18 August 2021
CROSS Safety Report
Report ID: 1039
Region: CROSS-UK
Cross-laminated timber (CLT) in multi-storey buildings
The CROSS-UK Fire Safety Expert Panel share their views about the interpretation and application of the Building Act 1984 with regards to the use of cross-laminated timber (CLT) in multi-storey buildings.
3 August 2021
CROSS Feature Article
Region: CROSS-UK
Timber framed buildings in fire situations - the role of the designer
This 2010 paper was updated in 2014 and the newer version should be used for reference.
1 November 2010
CROSS Topic Paper
Region: CROSS-UK
Timber framed buildings in fire situations - the role of the designer - update
This is an update of an earlier paper because there had been a number of severe fires in timber framed buildings during construction.
1 March 2015
CROSS Topic Paper
Region: CROSS-UK
Progressive collapse of an old mill building during a fire
An old mill building that was constructed around 1830 collapsed unexpectedly in a fire.
1 October 2008
CROSS Safety Report
Report ID: 122
Region: CROSS-UK
Torre Windsor building fire - Madrid
The 30 storey Torre Windsor office building consisted of a reinforced concrete frame and steel load-bearing mullions around the perimeter.
1 June 2005
CROSS Topic Paper
Region: CROSS-UK
Fire in multi-storey car parks
The severe fire at the Liverpool Echo Arena MSCP on 31st December 2017 gutted the seven-storey building and up to 1,400 cars were destroyed.
1 February 2018
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Building a safer future - summary of final report
This Alert is a summary of selected parts of the Independent Review of Building Regulations and Fire Safety: Final Report that are relevant to structural and civil engineers.
1 July 2018
CROSS Safety Alert
Region: CROSS-UK