Safety information search results
Filter your results
Materials
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 13 (3)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (21)
- CROSS Newsletter (13)
- CROSS Safety Report (55)
- News [sub-heading only] (2)
CROSS regions
Lack of method statements on domestic projects
A reporter has observed that where an opening is being formed on domestic properties for, say a rear extension, that the builders tend to remove the masonry and follow up with the temporary propping.
1 January 2019
CROSS Safety Report
Report ID: 757
Region: CROSS-UK
Fire hazards in historical modular timber framed buildings
A reporter has raised fire safety concerns suggesting the potential existence of a systemic issue pertaining to the design and construction of modular timber frame systems.
20 February 2024
CROSS Safety Report
Report ID: 1243
Region: CROSS-UK
Dangerous alteration work results in two terraced houses being demolished
Two mid terrace properties forming four flats had been underpinned and excavated to form a new basement whilst simultaneously removing internal and rear walls. This left the building in a dangerous condition and subject to a demolition order from the local council.
20 February 2024
CROSS Safety Report
Report ID: 1274
Region: CROSS-UK
Fire protection of steelwork supporting a timber floor
A reporter shares concerns that developers and Building Control officials are assuming that, if a timber joist floor construction is suitable to provide 30 minutes fire resistance loadbearing capacity then the structural steel supporting members within it will be similarly protected.
20 February 2024
CROSS Safety Report
Report ID: 1234
Region: CROSS-UK
Non approved sealants are used with CPVC pipes and fittings
A reporter highlights a concern when non approved sealants are used with chlorinated polyvinyl chloride (CPVC) sprinkler system pipework and fittings. This can cause failures and/or leaks.
20 February 2024
CROSS Safety Report
Report ID: 1228
Region: CROSS-UK