Safety information search results
Filter your results
Building or structure type
- Bridges (15)
- Buildings
(115)
- Agricultural buildings (2)
- Commercial (9)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (3)
- Higher-risk buildings (1)
- Industrial buildings (3)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (28)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (8)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Buried pipes & culverts (1)
- Flats & apartments (8)
- Freestanding walls (2)
- Houses (11)
- Masts & towers (7)
- Railways (7)
- Retaining structures (10)
- Roads (5)
- Sewers (1)
- Temporary structures (12)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (10)
- Assessment project [sub-heading only] (7)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (93)
- Demolition project (6)
- Excavation (7)
- Extension project (6)
- Fire safety assessment (1)
- Groundworks project (1)
- New build (51)
- Refurbishment (1)
- Remediation project (7)
- Repair project (4)
- Strengthening project (3)
- Structural assessment (7)
Method of construction
Structural form
Elements & systems
- Arch (4)
- Balconies (7)
- Balustrades (10)
- Basements (3)
- Beams (33)
- Bracing (13)
- Canopies (3)
- Ceilings (6)
- Cladding (8)
- Columns (18)
- Fasteners & connections (47)
- Fire exit doors (1)
- Fire protection (5)
- Foundations (10)
- Insulation (3)
- Light gauge steel framing (2)
- Padstones (1)
- Parapets (2)
- Roofs (16)
- Shear walls (1)
- Signs (1)
- Slabs (14)
- Trusses (2)
- Walls (26)
- Wall ties (2)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 23 (2)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (7)
- CROSS-UK Newsletter 33 (6)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (6)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (7)
- CROSS-UK Newsletter 39 (7)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (6)
- CROSS-UK Newsletter 43 (6)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (5)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (6)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (7)
- CROSS-UK Newsletter 51 (8)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 59 (6)
- CROSS-UK Newsletter 60 (3)
- (-) CROSS-UK [sub-heading only] (198)
- (-) CROSS Newsletter (198)
- CROSS Safety Report (198)
- News [sub-heading only] (26)
CROSS regions
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Snow loading in Scotland - summary of reports
There were heavy snowfalls over the entire United Kingdom in the winters of 2009/2010 and 2010/2011 and CROSS received a number of reports, mostly from Scotland where a significant number of buildings suffered roof collapses.
1 July 2011
CROSS Safety Report
Report ID: 264
Region: CROSS-UK
Quality of some imported steel components
Concerns are raised that the construction industry is procuring many materials such as steel plates, structural sections, and metal castings from outside the UK and that these are often found to have some issues in meeting specification.
1 January 2013
CROSS Safety Report
Report ID: 259
Region: CROSS-UK
Use of water filled containers to anchor temporary structures
The reporter who is a local authority Environmental Health Officer raises concerns over the use of water filled plastic containers being used as anchors/ballast at festivals.
1 July 2011
CROSS Safety Report
Report ID: 255
Region: CROSS-UK
Effect of staff change on a design
A reporter illustrates how risk can be generated from staff turnover.
1 October 2012
CROSS Safety Report
Report ID: 277
Region: CROSS-UK
False CE certificates
This report is about falsified documents in circulation within the EU purporting to be CE certificates.
1 January 2013
CROSS Safety Report
Report ID: 284
Region: CROSS-UK
Near collapse of masonry highway bridge
Works adjacent to a masonry arch bridge caused the foundations to subside and damage the bridge beyond repair.
1 October 2012
CROSS Safety Report
Report ID: 286
Region: CROSS-UK
Hoarding incident
A reporter says that under high, but not severe, wind loads a portion of timber hoarding failed and struck site personnel.
1 July 2013
CROSS Safety Report
Report ID: 278
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Certification of seismic design software
A reporter is concerned about third party certification of seismic design software and believes that users should carefully consider the assumptions that have been made in any such program.
1 October 2013
CROSS Safety Report
Report ID: 377
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.