Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Fire incident response
Method of construction
Elements & systems
- Balconies (4)
- Balustrades (9)
- Beams (20)
- Bracing (4)
- Cables (3)
- Canopies (1)
- Ceilings (1)
- Cladding (8)
- Columns (9)
- (-) Fasteners & connections (88)
- Foundations (6)
- Insulation (2)
- Light gauge steel framing (4)
- Padstones (1)
- Parapets (3)
- PV panels (1)
- Roofs (4)
- Slabs (1)
- Tendons (1)
- Trusses (3)
- Walls (5)
- Wall ties (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (4)
- CROSS-UK Newsletter 1 (4)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 60 (4)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (51)
- CROSS-US Newsletter 3 (1)
- CROSS Newsletter (32)
- CROSS Safety Alert (1)
- CROSS Safety Report (87)
- News [sub-heading only] (14)
CROSS regions
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Incorrect fabrication of balustrade connection
A reporter describes how threaded bars were incorrectly used for a balustrade fixing instead of bolts which led to failure of the connection.
6 April 2023
CROSS Safety Report
Report ID: 851
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Galvanic (bimetallic) corrosion not considered in cladding design
A cladding designer and installer did not consider galvanic (bimetallic) corrosion which led to remedial works being required.
30 June 2022
CROSS Safety Report
Report ID: 811
Region: CROSS-UK
Risks associated with steel gates
A reporter has noticed recurring defects with large gates in residential apartment complexes, including at least three where there were serious incidents, one involving a fatality.
30 July 2021
CROSS Safety Report
Report ID: 1021
Region: CROSS-UK
Accelerated corrosion of telecoms mast holding down bolts
During an examination of a 20m high telecoms mast, a reporter found that there had been accelerated corrosion of the galvanised holding down bolts.
1 June 2022
CROSS Safety Report
Report ID: 773
Region: CROSS-UK
Failure of metal cladding panels on bridges
This report discusses the findings of an investigation into the causes of the failure of metal cladding panels on a bridge parapet and provides recommendations concerning the use of pop rivets to fix such panels.
23 February 2024
CROSS Safety Report
Report ID: 944
Region: CROSS-UK
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.