Safety information search results
Filter your results
Building or structure type
- Bridges (30)
- Buildings
(115)
- Agricultural buildings (6)
- Commercial (10)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (5)
- Health care (1)
- Industrial buildings (7)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (6)
- Recreational buildings (3)
- Residential (26)
- Stadiums (5)
- Storage buildings (6)
- Tall buildings (4)
- Theatres & other entertainment buildings (2)
- Transport buildings (2)
- Car parks (5)
- Flats & apartments (10)
- Houses (6)
- Masts & towers (7)
- Railways (6)
- Retaining structures (6)
- Roads (1)
- Temporary structures (11)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (5)
- Design: quality management (20)
- Design calculations (27)
- Design conceptualisation (11)
- Design detailing (55)
- Design drawings (13)
- Design loads (27)
- Design software (10)
- Dynamics (6)
- Fire safety design (5)
- Resilience (7)
- Robustness (19)
- Structural design (75)
- Sustainability (1)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (9)
- Assessment project [sub-heading only] (5)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (79)
- Demolition project (2)
- Excavation (3)
- Extension project (7)
- New build (46)
- Refurbishment (6)
- Remediation project (6)
- Repair project (3)
- Strengthening project (4)
- Structural assessment (8)
Method of construction
Elements & systems
- Balconies (7)
- Balustrades (11)
- Basements (1)
- Beams (51)
- Bracing (13)
- Cables (4)
- Canopies (2)
- Ceilings (2)
- Cladding (10)
- Columns (27)
- Fasteners & connections (88)
- Fire protection (4)
- Foundations (8)
- Insulation (2)
- Light gauge steel framing (10)
- Lintels (2)
- Padstones (4)
- Parapets (4)
- PV panels (1)
- Roofs (17)
- Shear walls (1)
- Signs (1)
- Slabs (5)
- Tendons (1)
- Trusses (4)
- Walls (15)
- Wall ties (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (6)
- CROSS-UK Newsletter 1 (5)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 4 (6)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 20 (3)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 23 (4)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (3)
- CROSS-UK Newsletter 32 (3)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 36 (4)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (4)
- CROSS-UK Newsletter 51 (4)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (4)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 60 (6)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (121)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (87)
- CROSS Safety Alert (4)
- CROSS Safety Report (210)
- CROSS Topic Paper (2)
- News [sub-heading only] (30)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
Fall of bridge deck support due to bolt over-tightening
A 7t steel frame designed to temporarily support part of a bridge deck during bearing refurbishments work fell from height as it was about to be lowered some 21m to the ground.
1 January 2011
CROSS Safety Report
Report ID: 216
Region: CROSS-UK
Do current regulations apply when repairing older buildings?
A 19th century three story mill was subject to a fire which resulted in the sudden collapse of part of the interior structure.
1 October 2010
CROSS Safety Report
Report ID: 212
Region: CROSS-UK
Design deficiencies in calculations submitted to a Local Authority
A Local Authority Building Control manager has sent a list which gives twenty nine of the more serious design review queries raised by the building control structural checking process over the last five years.
1 October 2010
CROSS Safety Report
Report ID: 210
Region: CROSS-UK
Concern about bridge hangers
A reporter is concerned that a failure in recent years involving the cast connections at each end of vertical bars, which connected to a bow string arch at one end and to a bridge deck at the other, may be in use elsewhere.
1 July 2012
CROSS Safety Report
Report ID: 222
Region: CROSS-UK
Verification of inspection documents
A reporter raises concern after evidence had recently been received that an increased number of ‘copies’ of the supplier’s inspection certificates for heavy plate products had been modified from the original state or falsified.
1 April 2011
CROSS Safety Report
Report ID: 226
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Defective imported scaffold ties
On a contract where multi lift access scaffolds had been installed for a period of up to 18 months in an exposed coastal location, it was found by a reporter on one of the regular inspections that some of the scaffold ties had failed.
1 April 2011
CROSS Safety Report
Report ID: 230
Region: CROSS-UK
Snow loads on agricultural buildings in Scotland
The reporter raises concerns that the snow loading situation with regards to agricultural buildings (in Scotland) and perhaps all buildings may require review.
1 July 2011
CROSS Safety Report
Report ID: 248
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK