Safety information search results
Filter your results
Building or structure type
- Bridges (65)
- Buildings
(514)
- Agricultural buildings (9)
- Commercial (49)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (38)
- Health care (16)
- Higher-risk buildings (7)
- Industrial buildings (23)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (2)
- Public, religious & civic buildings (14)
- Recreational buildings (9)
- Residential (151)
- Stadiums (6)
- Storage buildings (11)
- Tall buildings (24)
- Theatres & other entertainment buildings (11)
- Transport buildings (6)
- Buried pipes & culverts (7)
- Car parks (18)
- Flats & apartments (64)
- Floating structures (1)
- Freestanding walls (5)
- Hotels & hostels (13)
- Houses (55)
- Marine structures (3)
- Masts & towers (19)
- Offshore structures (2)
- Railways (18)
- Reservoirs & dams (2)
- Retaining structures (41)
- Roads (14)
- Sewers (5)
- Temporary structures (44)
- Tunnels (4)
Building height
- 5m or higher, but lower than 11m (24)
- 5m or higher, but lower than 12m (4)
- 11m or higher, but lower than 18m (15)
- 18m or higher, but lower than 30m (13)
- 30m or higher (9)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK [sub-heading only] (22)
- CROSS-US [sub-heading only] (2)
- Lower than 5m (5)
- Lower than 5m (2)
Materials
Project or lifecycle stage
Design
- BIM (6)
- Computational design (14)
- Design: quality management (72)
- Design calculations (81)
- Design conceptualisation (30)
- Design detailing (113)
- Design drawings (37)
- Design loads (117)
- Design software (34)
- Dynamics (12)
- Fire safety design (22)
- Resilience (24)
- Robustness (62)
- Structural design (147)
- Sustainability (9)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (43)
- Assessment project [sub-heading only] (21)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (263)
- Demolition project (16)
- Excavation (17)
- Extension project (21)
- Fire safety assessment (2)
- Groundworks project (3)
- Maintenance project (5)
- New build (119)
- Refurbishment (21)
- Remediation project (23)
- Repair project (10)
- Strengthening project (11)
- Structural assessment (30)
- Underpinning project (4)
Construction period
Elements & systems
- Arch (8)
- Balconies (17)
- Balustrades (25)
- Basements (13)
- Beams (86)
- Bracing (23)
- Cables (4)
- Canopies (8)
- Ceilings (26)
- Cladding (41)
- Columns (50)
- Fasteners & connections (177)
- Fences (1)
- Fire exit doors (2)
- Fire protection (17)
- Foundations (44)
- Insulation (10)
- Light gauge steel framing (11)
- Lintels (4)
- Padstones (5)
- Parapets (12)
- PV panels (4)
- Roofs (81)
- Sandwich panels (3)
- Shear walls (5)
- Signs (5)
- Slabs (60)
- Tendons (2)
- Trusses (11)
- Wall head restraints (3)
- Walls (116)
- Wall ties (14)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
- CROSS-AUS [sub-heading only] (13)
- CROSS-UK [sub-heading only]
(55)
- Building Control Northern Ireland (3)
- Building Safety Regulator (BSR) (1)
- Environment Agency (2)
- Fire and Rescue Service (FRS) (3)
- Health and Safety Executive (HSE) (19)
- Local Authority Building Control (LABC) (24)
- Local Authority Building Standards Scotland (LABSS) (3)
- Scottish Environment Protection Agency (SEPA) (1)
- CROSS-US [sub-heading only] (1)
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (6)
- CROSS-AUS Newsletter 3 (6)
- CROSS-AUS Newsletter 4 (6)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (19)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (9)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (9)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (10)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (391)
- CROSS-US Newsletter 1 (5)
- CROSS-US Newsletter 2 (6)
- CROSS-US Newsletter 3 (5)
- CROSS-US [sub-heading only] (10)
- CROSS Feature Article (1)
- CROSS Newsletter (235)
- CROSS Review (21)
- CROSS Safety Alert (30)
- CROSS Safety Report (768)
- CROSS Theme Page (2)
- CROSS Topic Paper (24)
- News [sub-heading only] (75)
- Safety information from CROSS [sub-heading only] (4)
- Safety information [sub-heading only] (5)
- Third party article (1)
- Third party content (11)
- Third party content (5)
- Third party report (1)
CROSS regions
Frustration about getting a response to a public safety concern
A member of the public reported a partially collapsed retaining structure to bodies they believed could be the responsible authority. Despite continued efforts to get attention to the issue, there was no apparent action to address the concern. This raised the reporter’s concern for public safety.
20 February 2023
CROSS Safety Report
Report ID: 1154
Region: CROSS-UK
RAAC planks in a 1970s shopping centre
An existing large shopping centre built circa 1975 had a number of external storerooms and loading bays with roofs constructed using reinforced autoclaved aerated concrete (RAAC) planks. The planks had deflected to the extent that they needed replacing.
20 February 2023
CROSS Safety Report
Report ID: 1155
Region: CROSS-UK
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
Fire involving fluorescent light fitting
A fire involving a fluorescent light fitting occurred in a corridor in a sheltered housing complex.
21 August 2023
CROSS Safety Report
Report ID: 1157
Region: CROSS-UK
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK
Cladding subcontractor change of connection strategy led to failure
As part of their final design submission, a cladding subcontractor changed the connection strategy for their cladding system. The project structural engineer did not identify the design change and the cladding loading resulted in excessive deflection and some twisting of the primary perimeter steel.
21 August 2023
CROSS Safety Report
Report ID: 1189
Region: CROSS-UK
Failure to grout steel frame bases
A reporter describes a problem that arose during the construction stage of a project when a steel frame supporting pipe and cable racks was loaded before the frame baseplates were grouted.
24 May 2023
CROSS Safety Report
Report ID: 1190
Region: CROSS-UK
Accelerated corrosion of telecoms mast holding down bolts
During an examination of a 20m high telecoms mast, a reporter found that there had been accelerated corrosion of the galvanised holding down bolts.
1 June 2022
CROSS Safety Report
Report ID: 773
Region: CROSS-UK
Defects found in precast (prefabricated) concrete façades
The reporter found several issues when inspecting or reviewing buildings with precast concrete façades, particularly on older buildings, due to a lack of attention to durability and poor workmanship.
30 March 2023
CROSS Safety Report
Report ID: 995
Region: CROSS-AUS
Failures of cold formed steel floor systems during construction
This report describes numerous collapses during construction of cold formed steel floor systems caused by lack of bracing/fastening and overloading of an incomplete structure.
10 May 2021
CROSS Safety Report
Report ID: 997
Region: CROSS-US