Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (8)
- CROSS Newsletter (1)
- CROSS Safety Report (15)
- News [sub-heading only] (3)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Inadequate design for basement works
An inadequate structural design for alterations to a basement led to structural distress within a substantial five-storey townhouse.
21 November 2022
CROSS Safety Report
Report ID: 1132
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
The myth of quality assurance
This report argues that to achieve the objective of good quality construction that satisfies the design intent there is no substitute for the practice of regular site inspections being conducted by the original design engineer. It questions whether there has been too much reliance on the process of quality assurance systems to the detriment of the quality of the end product.
25 November 2021
CROSS Safety Report
Report ID: 960
Region: CROSS-AUS
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK
Combination load cases in proprietary software cause concern
A reporter is concerned about a widely used software package that does not, in their opinion, generate load combinations in accordance with the Eurocodes being followed.
18 October 2023
CROSS Safety Report
Report ID: 1170
Region: CROSS-UK
Cladding subcontractor change of connection strategy led to failure
As part of their final design submission, a cladding subcontractor changed the connection strategy for their cladding system. The project structural engineer did not identify the design change and the cladding loading resulted in excessive deflection and some twisting of the primary perimeter steel.
21 August 2023
CROSS Safety Report
Report ID: 1189
Region: CROSS-UK
Design deficiencies in calculations submitted to a Local Authority
A Local Authority Building Control manager has sent a list which gives twenty nine of the more serious design review queries raised by the building control structural checking process over the last five years.
1 October 2010
CROSS Safety Report
Report ID: 210
Region: CROSS-UK
Tying walls to floors in domestic properties
A reporter provides structural ‘back-up’ to architects and raises concerns of insufficient notes being placed on drawings.
1 April 2011
CROSS Safety Report
Report ID: 164
Region: CROSS-UK
Checking at a price
In relation to the checking of calculations on behalf of local authorities for building regulation submissions a reporter is concerned about checking engineers who are paid very low hourly rates.
1 October 2011
CROSS Safety Report
Report ID: 227
Region: CROSS-UK
Building regulations checking
A reporter’s firm has been carrying out building regulations checks for 25 years, but it is only in the last six or seven years (say 2000-2006) that concerns have arisen, some of which are described below.
1 July 2007
CROSS Safety Report
Report ID: 33
Region: CROSS-UK