Overall stability of building proposed to be provided by metal framing and plasterboard
Metal framing and plasterboard was used to provide lateral stability to a building. The form of construction was later deemed to be unsuitable and extensive remedial works had to be carried out.
24 May 2023
CROSS Safety Report
Report ID: 468
Region: CROSS-UK
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Snow drift implications due to building extension
Part of a roof collapsed in a factory and warehouse facility shortly after a storm event due to snow drift loads.
13 December 2022
CROSS Safety Report
Report ID: 947
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Concern over concrete test methods used on site
A reporter is concerned about the test method a contractor uses to justify the strength of concrete placed on site.
13 December 2022
CROSS Safety Report
Report ID: 840
Region: CROSS-UK
Design of internal partitions for horizontal loads
This report draws attention to the requirement for internal partitions to be designed for horizontal loads from wind and seismic effects in accordance with Section B of the Australian National Construction Code (NCC).
30 April 2021
CROSS Safety Report
Report ID: 1000
Region: CROSS-AUS
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.