Project type
- Alteration & conversion project (6)
- Assessment project [sub-heading only] (5)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (28)
- Demolition project (1)
- Excavation (1)
- Extension project (5)
- Groundworks project (2)
- New build (5)
- Refurbishment (4)
- Remediation project (2)
- Repair project (2)
- Strengthening project (1)
- Structural assessment (11)
Construction period
Elements & systems
- ACM cladding (1)
- Arch (1)
- Basements (1)
- Beams (4)
- Bracing (1)
- Cables (1)
- Cladding (7)
- Columns (3)
- Fasteners & connections (11)
- Fences (1)
- Fire protection (1)
- Foundations (7)
- Insulation (1)
- Light gauge steel framing (2)
- Padstones (1)
- PV panels (1)
- Roofs (6)
- Shear walls (2)
- Slabs (6)
- Tendons (1)
- Trusses (2)
- Walls (8)
- Wall ties (2)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
CROSS regions
Overall stability of building proposed to be provided by metal framing and plasterboard
Metal framing and plasterboard was used to provide lateral stability to a building. The form of construction was later deemed to be unsuitable and extensive remedial works had to be carried out.
24 May 2023
CROSS Safety Report
Report ID: 468
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Delay by party wall surveyor adds to risk
A party wall surveyor causes delay which prevents a dangerous wall from being made safe in a timely manner.
10 March 2022
CROSS Safety Report
Report ID: 1010
Region: CROSS-UK
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK
Modern methods of construction and robustness
This report relates to the design of a low rise modular building and the requirement, or otherwise, for positive fixings between the superstructure and the substructure.
24 May 2023
CROSS Safety Report
Report ID: 1179
Region: CROSS-UK
RAAC planks in a 1970s shopping centre
An existing large shopping centre built circa 1975 had a number of external storerooms and loading bays with roofs constructed using reinforced autoclaved aerated concrete (RAAC) planks. The planks had deflected to the extent that they needed replacing.
20 February 2023
CROSS Safety Report
Report ID: 1155
Region: CROSS-UK
Collapse of folded plate timber roof at a school
This report is about a critical safety issue concerning folded timber roofs, in various settings, including over school halls.
18 October 2023
CROSS Safety Report
Report ID: 1160
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.