Safety information search results
Filter your results
Building or structure type
- Bridges (56)
- Buildings
(417)
- Agricultural buildings (7)
- Car parks (15)
- Commercial (44)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (33)
- Health care (14)
- Higher-risk buildings (5)
- Industrial buildings (20)
- Laboratory buildings (1)
- LPS buildings (3)
- Nuclear & energy buildings (2)
- Public, religious & civic buildings (12)
- Recreational buildings (7)
- Residential (116)
- Stadiums (4)
- Storage buildings (11)
- Tall buildings (16)
- Theatres & other entertainment buildings (9)
- Transport buildings (5)
- Buried pipes & culverts (3)
- Floating structures (1)
- Freestanding walls (5)
- Marine structures (2)
- Masts & towers (14)
- Offshore structures (1)
- Railways (13)
- Reservoirs & dams (1)
- Retaining structures (35)
- Roads (11)
- Sewers (4)
- Temporary structures (36)
- Tunnels (4)
Building height
Materials
Project or lifecycle stage
Design
- BIM (3)
- Computational design (11)
- Design: quality management (53)
- Design calculations (64)
- Design conceptualisation (26)
- Design detailing (78)
- Design drawings (26)
- Design loads (103)
- Design software (26)
- Dynamics (9)
- Fire safety design (13)
- Resilience (21)
- Robustness (60)
- Structural design (114)
- Sustainability (7)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (38)
- Assessment project [sub-heading only] (16)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (183)
- Demolition project (14)
- Excavation (13)
- Extension project (16)
- Groundworks project (3)
- Maintenance project (1)
- New build (68)
- Refurbishment (20)
- Remediation project (10)
- Repair project (7)
- Strengthening project (6)
- Structural assessment (24)
- Underpinning project (4)
Construction period
Elements & systems
- Arch (7)
- Balconies (12)
- Balustrades (18)
- Basements (12)
- Beams (55)
- Bracing (17)
- Cables (2)
- Canopies (5)
- Ceilings (23)
- Cladding (32)
- Columns (31)
- Fasteners & connections (141)
- Fences (1)
- Fire exit doors (1)
- Fire protection (9)
- Foundations (31)
- Insulation (7)
- Light gauge steel framing (6)
- Lintels (3)
- Padstones (4)
- Parapets (5)
- PV panels (4)
- Roofs (70)
- Sandwich panels (3)
- Shear walls (3)
- Signs (3)
- Slabs (44)
- Tendons (1)
- Trusses (7)
- Wall head restraints (2)
- Walls (94)
- Wall ties (11)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (8)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (10)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (291)
- CROSS-US Newsletter 3 (5)
- CROSS Feature Article (1)
- CROSS Newsletter (153)
- CROSS Review (21)
- CROSS Safety Alert (30)
- CROSS Safety Report (605)
- CROSS Theme Page (3)
- CROSS Topic Paper (24)
- News [sub-heading only] (51)
- Safety information from CROSS [sub-heading only] (3)
- Safety information [sub-heading only] (4)
- Third party article (1)
- Third party content (11)
- Third party content (5)
- Third party report (1)
CROSS regions
Potentially unsafe buckling resistance checks using software
A number of anomalies were detected in the outputs from a proprietary structural steelwork design program.
6 June 2022
CROSS Safety Report
Report ID: 1075
Region: CROSS-UK
Change of use to care home
A report has been received relating to the intended change of use of a large building.
6 June 2022
CROSS Safety Report
Report ID: 1078
Region: CROSS-UK
The reliability of technical data for proprietary products
This report highlights the importance of verifying technical data provided by the manufacturer or supplier of proprietary products.
25 November 2021
CROSS Safety Report
Report ID: 1080
Region: CROSS-AUS
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Inadequate modelling of existing building
An existing building suffered damage while being upgraded, which led to a more detailed inspection of the existing building’s condition. The report highlights the importance of conducting a thorough investigation and assessment of an existing building structure to ensure an understanding of how it will perform under the applied design loads, rather than relying on assumptions that may be unre...
30 March 2023
CROSS Safety Report
Report ID: 1082
Region: CROSS-AUS
Concern over modelling of concrete frame building for construction stage
Independent check shows inadequate modelling of concrete frame building with transfer slab.
10 March 2022
CROSS Safety Report
Report ID: 1073
Region: CROSS-UK
Intumescent paint application
A report has been received regarding issues of detailing by following the relevant advice provided from an intumescent paint supplier.
6 June 2022
CROSS Safety Report
Report ID: 1113
Region: CROSS-UK
Stainless steel - the risk of failure due to stress corrosion cracking
Swimming pool building environments can create very aggressive situations stemming from high temperatures, the number of users and the chemical disinfectants used and this can lead to corrosion and failure of stainless steel components.
1 October 2005
CROSS Safety Alert
Region: CROSS-UK
Ineffective fire socks
A reporter shares their concern about how the quality of fire stopping in a residential project was found to be substandard and the potential reasons that led to this happening.
10 March 2022
CROSS Safety Report
Report ID: 1115
Region: CROSS-UK
Fire protection to light gauge steel frame walls
A disagreement between fire engineers and manufacturers on testing for the loadbearing performance of light gauge steel frame walls in case of fire has been reported.
21 June 2022
CROSS Safety Report
Report ID: 1116
Region: CROSS-UK