Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (18)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (47)
- Demolition project (4)
- Excavation (2)
- Extension project (6)
- Maintenance project (1)
- New build (9)
- Refurbishment (6)
- Remediation project (5)
- Repair project (4)
- Strengthening project (4)
- Structural assessment (3)
Method of construction
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 10 (2)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 20 (4)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (60)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (3)
- CROSS Newsletter (26)
- CROSS Safety Alert (2)
- CROSS Safety Report (109)
- News [sub-heading only] (11)
CROSS regions
Brick wall removed to leave precast panels unsupported
Precast concrete slabs were left unsupported after a supporting brick wall was removed during demolition works.
1 July 2014
CROSS Safety Report
Report ID: 384
Region: CROSS-UK
Blockwork lateral restraint
A recent building control inspection revealed issues with basement blockwork walls restrained by wind posts.
1 January 2015
CROSS Safety Report
Report ID: 414
Region: CROSS-UK
Fatal wall collapse at school due to wall climbing
This report has been provided by the Health and Safety Executive (HSE) and once again highlights the potential dangers of freestanding masonry walls.
1 July 2018
CROSS Safety Report
Report ID: 447
Region: CROSS-UK
Cantilevered brickwork - fatal collapse during construction
A blade of 270mm cavity brickwork in a temporary condition fell and killed a bricklayer after sixteen scaffold planks were leant against the wall on the side remote from the bricklayer.
1 April 2015
CROSS Safety Report
Report ID: 476
Region: CROSS-UK
Stability of brick walls
A 230mm cantilevered brick wall approximately 1.6m high failed after backfill material was placed behind it, which was not the design intent.
1 April 2015
CROSS Safety Report
Report ID: 475
Region: CROSS-UK
Large stone panel falls from building façade
A reporter witnessed a large stone panel detach from a second floor beam and fall to the ground, narrowly missing a group of school children.
1 July 2019
CROSS Safety Report
Report ID: 467
Region: CROSS-UK
Gallows brackets for supporting chimney breasts
A reporter has seen suggestions that gallows brackets are suitable for support after the removal of internal chimney breasts.
1 October 2015
CROSS Safety Report
Report ID: 481
Region: CROSS-UK
Inadequate of biomass fuel stores
A reporter raises concerns over designs they have come across for biomass storage structures where the appropriate lateral loads have not been considered.
1 July 2015
CROSS Safety Report
Report ID: 512
Region: CROSS-UK
Undermined bridge wing wall collapses
A masonry wing wall of a bridge collapsed and fell as a single section coming to rest against an adjacent pile after being undermined on site.
1 April 2016
CROSS Safety Report
Report ID: 577
Region: CROSS-UK
Fixing systems for gravestones
This report is about the safety of pins used to hold headstones in place.
1 October 2016
CROSS Safety Report
Report ID: 601
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.